My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-050
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2015 2:24:50 PM
Creation date
10/1/2015 6:00:10 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
04/15/2014
Control Number
2014-050
Agenda Item Number
8.C.
Entity Name
JMC Services of Winter Park Fl.
Subject
Custodial Services Agreement
Fourth Amendment
Supplemental fields
SmeadsoftID
13083
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction observation will be provided by a field inspector. Total observation time is <br /> anticipated to be approximately 40 - hours . The Consultant's visits will be for the purpose of <br /> endeavoring to provide the Client a greater degree of confidence that the completed work of its <br /> contractors will generally conform to the construction documents prepared by the Consultant . The <br /> Consultant neither guarantees the performance of contractors, nor assumes responsibility for any <br /> contractor' s failure to perform its work in accordance with the contract documents . Work that the <br /> Consultant believes does not comply with the contract documents will be brought to the attention <br /> of Indian River County Utilities and the contractor . The Consultant shall have no responsibility for <br /> any contractor's means, methods, techniques , equipment choice and usage , sequence, schedule , <br /> safety programs , or safety practices , nor shall the Consultant have any authority or responsibility to <br /> stop or direct the work of any contractor. <br /> Additional punch- list items will be reviewed and a list prepared for the items that need to be <br /> completed for final closeout of the project . The Consultant will perform one additional site visit <br /> with the contractor to review the status of the completion of these punch- list items . <br /> The Consultant will prepare record drawings of the project using information provided by the <br /> contractor. An electronic copy in AutoCAD format on a CD- ROM , and two sets of prints will be <br /> delivered to Indian River County Utilities upon completion of this project . <br /> Consultant will attend operational testing of the lime and carbon dioxide systems for both facilities , <br /> and observe equipment operation , establish design dosages which provide optimum hardness and, <br /> alkalinity improvement in the finish water, and prepare a startup summary page of the dosages <br /> established during startup . <br /> ADDITIONAL SERVICES <br /> The following services are not included in the Scope of Services for this project, but may be <br /> required depending on circumstances that may arise during the execution of this project . Other <br /> items that may be considered additional services are mentioned herein . <br /> ATTACHMENT 1 - SCHEDULE <br /> Services are anticipated to be completed within 2 months ( May 19 , 2014) and are dependent on <br /> contractors ' schedule . <br /> ATTACHMENT 2 - FEES <br /> We will provide these services in accordance with our Continuing Services Contract Agreement for <br /> Professional Services dated November 15 , 2011 , with Indian River County . <br /> The Consultant will provide these additional services for Task 1 on a lump sum basis and Task 2 <br /> on a cost plus , not to exceed basis as follows: <br /> Task No . Task Task Fee <br /> Task 1 Design Sketches for Degasifier Platform $ 39200 <br /> Task 2 Construction Phase Services (2 months) $315200 <br /> Total Lump Sum Fee = $349400 <br /> FAUtilities\UTILITY - Engineering\WATER\WTP - North RO\Lime Slurry Injection Project-UCP 2715\AdminTW <br /> Stabilization Construction Phase Amendment - Amd# 2 to WO 3 Exhibit. doc . <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.