Laserfiche WebLink
PROPOSAUCONTRACT <br /> WILCO CONSTRUCTION INC'. <br /> 28N CAUSEWAY DR UNIT 91 <br /> FT. PIERCE, FL 34946 <br /> PH 772460F=6928 772460-6929 <br /> CGC: #1507437 <br /> W W W_ .:W ILCOMARINECONSTRUCTION:COM <br /> PROPOSAL SUBMITTED TO. - pESCRIPTION OF JOB: . <br /> SCHUTT BUILDERS KELLY RESIDENCE, SEAWALL <br /> 1114 17TH`ST 905 BOWLINE DR <br /> VERO BEACH , FL 32960 MOORINGS CLUB. <br /> PH° 772-569w4999 <br /> WE HEREBYSUBMIT' SPECIFICATIONS AND ESTIMATES FOR: <br /> A. BALANCE OF PROPERTY (RECOMMENDED) <br /> 1. FURNISH AND INSTALL UP TO 21 L FT OF BATTER PILE TYPE REPAIR ON EXISTING W <br /> FALL (MATCH SOUTH ENDO WALL) <br /> 2. FURNISH AND INSTALL UP TO. 12 L FT:ONEW BATTER SLAB TYPE SEAWALL (AT PIPE AREA) <br /> COST -- $140980.00 <br /> B. FILUSOD <br /> 1 , FURNISH AND INSTALL UP TO 18 YDS FILL DIRT AND 1 PALLET SOD <br /> COST -- $690.00 <br /> NOTES: <br /> 1 , WILCO CONSTRUCTION CARRIES U . S.L. & H WORKERS COMPENSATION INSURANCE ASPER ;FEDERAL REGULATIONS FOR <br /> MARINE CONSTRUCTION , <br /> 2. ACCESS FOR EQUIPMENT, MATERIALS, ANDD CREW°REQUIRED <br /> 3: PERMITS AND ASSOCIATED COSTS'EXTRA AT COST`(APPROX COST $1 ;600.00) <br /> 4. EXCLUDED: LANDSCAPE, IRRIGATION, ELECTRIC, PLUMBING , STORM DRAIN WORK/REPAIR . (BEYOND SEAWALL CONNECTION) <br /> AND/OR ANY WORK BEYOND STATED ABOVE, <br /> PAYMENTS AS'F L9 LOM- 10% UPON CONTRACT , 50% OF CONTRACT UPON 'COMMENCEMENT OF WORK AND BALANCE UPON INSTALLATION: <br /> DATE: AUTHOR14D'.SIGNATURE: <br /> 7/28/2011' , ROBERT WILLIAMS <br /> IHAVE;READ THIS PROPOSAIJCONTRACTAND UNDERSTAND1TS, TERMSAND CONDITIONS 'AND ACCEPT THE SAME INCLUDING THOSE'ON THE <br /> REVERSE SIDE OF THIS FORM, WILCO IS AUTHORIZED TO DO THE WORK SPECIFIED IN THE:CONTRACT ONLY. PAYMENT MADE AS STATED <br /> ABOVE. ALL INVOICES ARE PART OF THISIPROPOSALICONTRACT, <br /> DATE: SIGNATURE: <br />