My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-048
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 11:21:22 AM
Creation date
10/1/2015 5:59:58 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/08/2014
Control Number
2014-048
Agenda Item Number
15.B.3
Entity Name
Kessler Consulting
Subject
Work Order No. 1 Solid Waste Procurement Services
Authorization Form
Sold Waste Disposal District
Supplemental fields
SmeadsoftID
13081
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
multiple plan sheets will be provided. <br />The ENGINEER will provide engineering services on an as requested basis during construction <br />to address questions and requests for additional information, and to address unforeseen <br />construction issues that may arise. The ENGINEER will perform site inspections on an as - <br />requested basis during the construction of the project, will attend construction progress meetings <br />as requested by the COUNTY, and will prepare plan revisions and additional construction <br />drawings on an as needed basis as requested by the COUNTY. <br />"SECTION IV ā TIME FOR COMPLETION" is being modified to incorporate the <br />following: <br />The time for completion of Amendment Number 15 shall run concurrently with the construction <br />of this project. <br />"SECTION V ā COMPENSATION" is being modified to incorporate the following: <br />The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered <br />pursuant to this Agreement fees m accordance with the following: <br />A. Professional Services Fee <br />1. The basic compensation mutually agreed upon by the ENGINEER and the <br />COUNTY follows: <br />The following is a summary of costs: <br />Charge Associated with <br />Change in Project Scope <br />And Project Limits <br />Geotechnical Services (l"rerra)(Lump Sum) $0.00 <br />Engineering (ARCADLS) (Lump Sum) $2,715.00 <br />Signal Plans (ARCADIS) $0.00 <br />Design Survey (66th Avenue) (ARCADIS) $0.00 <br />Design Survey (Sidestreets) (ARCADIS) $0.00 <br />Right -of -Way Survey and Map (664%Avenue) $0.00 <br />Right-of-way Survey (Sidestreets) $0.00 <br />Structural Design for 4 bridges <br />New Total <br />Compensation <br />$139,460.00 <br />$963,387.50 <br />$84,728.66 <br />$169,500.00 <br />$71,428.00 <br />$117,821.00 <br />$61,963.00 <br />Page 2 of 5 <br />Gā¢\LNR Support\ADMIN\Marketing\Proposals\WPB\2014\66 th Ave Amendment No 15 4-4-14 .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.