My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-162
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-162
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2016 3:13:55 PM
Creation date
10/1/2015 2:20:21 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
07/06/2010
Control Number
2010-162
Agenda Item Number
8.J.
Entity Name
Kimley-Horn and Associates
Subject
Oslo Road Phase II Roadway Improvements
Amendment No. 4 to agreement dated 02/22/2005
Area
43rd to 27th Avenues
Supplemental fields
SmeadsoftID
9725
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County, Amendment No. 4 <br /> Oslo Road Phase II Roadway Improvement <br /> appropriate to the orderly completion of Contractor's work . Any orders <br /> authorizing variations from the Contract Documents will be made by the <br /> COUNTY . <br /> 4 . Change Orders . The ENGINEER may recommend Change Orders to the <br /> COUNTY, and will review and make recommendations related to Change Orders <br /> submitted or proposed by the Contractor. <br /> 5 . Shop Drawings and Samples . All shop drawings are to be reviewed and approved <br /> by the COUNTY . <br /> 6 . Inspections and Tests . All inspections and testing will be conducted by the <br /> COUNTY . <br /> 7 . Applications for Payment . All applications for payment will be reviewed and <br /> approved by the COUNTY . <br /> 8 . Final Notice of Acceptability of the Work . The County will be responsible for <br /> project acceptance, as -built drawing review and permit certifications . <br /> 9 . Limitation of Responsibilities . The ENGINEER shall not be responsible for the <br /> acts or omissions of any Contractor, or of any of their subcontractors , suppliers , or <br /> of any other individual or entity performing or furnishing the Work. The <br /> ENGINEER shall not have the authority or responsibility to stop the work of any <br /> Contractor. <br /> B . Supplemental Design Survey <br /> The ENGINEER will provide updated design topographic survey data to reflect <br /> changes along the corridor that have taken place since the completion of the initial <br /> design survey. The changes along the corridor located within the project limits <br /> consist of the following : <br /> 1 . Goodwill/ Ace Hardware Vehicle Access Connection <br /> 2 . FP &L Electrical Distribution Poles <br /> 3 . Vero Christian Church Vehicle Access Connection <br /> 4 . Commercial Development location in Oslo Road/ 27 `h Avenue SE <br /> quadrant. <br /> C . Design Plan Revision <br /> The ENGINEER shall update the construction documents to incorporate the <br /> supplemental design survey data . The construction documents shall integrate these <br /> changes in existing conditions and the design improvements will be updated to reflect <br /> these conditions . The ENGINEER shall update the stormwater management design <br /> facilities to incorporate landscape buffering around the facility perimeters . <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.