My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-123
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-123
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2015 12:01:06 PM
Creation date
10/1/2015 5:21:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
07/02/2013
Control Number
2013-123
Agenda Item Number
12.J.1
Entity Name
Kimley-Horn & Associates
Subject
Amendment No.1, Work Order No. 5
Water Treatment Plant Acid Tank Replacement
Supplemental fields
SmeadsoftID
11973
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT # 1 <br /> Amendment #1 to <br /> Work Order Number 5 <br /> Bulk Acid Tank Replacement at South Oslo Water Treatment Plant <br /> PROJECT UNDERSTANDING <br /> This amendment modifies Work Order #5 to include permitting and certification of <br /> completion, which was not included under the original scope . FDEP Southeast District <br /> has requested a minor modification permit be submitted with application fee for <br /> replacement of the tank and does not consider the tank replacement like for like due to <br /> the significant size reduction . The scope of work consists of permit application <br /> preparation, response to FDEP requests for information, and final certification of <br /> completion. <br /> SCOPE OF WORK <br /> Task 1 : Permit Application Preparation <br /> Consultant will prepare permit application Form 62-555 .900( 1 ) and submit application <br /> with supporting plans and specifications to the Florida Department of Environmental <br /> Protection Southeast District. Consultant will prepare design calculations which support <br /> the substantial reduction in tank capacity and submit supporting documents with FDEP <br /> application. <br /> Consultant will answer one round of requests for information from FDEP . <br /> A permit application fee of $ 1 ,000 will be furnished by Owner as part of the application. <br /> Task 2 : Certification of Completion <br /> Consultant will witness final installation of storage tank, supporting piping, valves, and <br /> instrumentation. <br /> Consultant will prepare a Certification of Construction Completion and Request for <br /> Clearance to Place Permitted PWS Components into Operation (FAC Form 62 - <br /> 555 . 900(9) . <br /> Consultant will submit record drawings as part of the certification, which will be based <br /> on information provided by the contractor. Major modifications to the drawings will be <br /> provided by the contractor. <br /> SCHEDULE <br /> K:\WPB_Civil\044572025 - SRO Acid Tank Replacement\Scope\Acid Tank Permitting Amendment revl .docx Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.