Laserfiche WebLink
EXHIBIT #1 <br /> Work Order Number 5 <br /> Bulk Acid Tank Replacement <br /> At South Oslo Water Treatment Plant <br /> PROJECT UNDERSTANDING <br /> The existing bulk acid tank is more than 12 years old and at the end of its service life, and <br /> therefore, replacement of the tank necessary. Since the acid demands have been reduced in the <br /> feedwater with the use of alternative scale inhibitors, a smaller sized bulk tank is suggested. <br /> Associated piping and containment coatings should also be addressed as part of the tank <br /> replacement. The scope of work consists of design plans and specifications for a new tank and <br /> associated supply piping, coordination with FDEP, and limited construction phase services . <br /> SCOPE OF WORK <br /> Task le. Review Existing Conditions <br /> Consultant will review existing tank and piping at the South Oslo Road plant and evaluate options <br /> for a replacement tank. Consultant will develop a phasing plan to allow replacement of the <br /> existing tank without interrupting service. <br /> Task 2 : Design Plans and Specification <br /> Consultant will prepare plans and specifications for a replacement tank. Plans will consist of a <br /> site plan, tank supports, piping, tie-in details, and general details . Photos may be used to depict <br /> details. It is anticipated that approximately four (4) drawings will be prepared <br /> Specifications will be prepared and consist of the replacement tank, associated piping, coating of <br /> existing containment area, and demolition of existing tank. <br /> Consultant will provide 90% plans and specifications for review and comment as well as final <br /> plans and specifications for construction. Drawings will be provided in electronic (Pdf — portable <br /> document format) form. <br /> Task 3 : Coordination <br /> Consultant will prepare a letter of notification to Florida Department of Environmental Protection <br /> (FDEP) regarding tank replacement. It is assumed that a FDEP permit is not required for the tank <br /> replacement, but that justification for a reduced size tank will be necessary. <br /> Consultant will answer questions from contractors regarding the scope of work during the <br /> price proposal phase . Consultant will review one set of shop drawings on the tank and <br /> piping during the construction phase of the project. <br /> SCHEDULE <br /> CADocuments and Settings\mikeh\Local Settings\Temporary Intemet Files\OLKA\Acid Tank Scope rev (2).docx Page I of <br />