My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-004
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2015 10:11:41 AM
Creation date
10/1/2015 3:27:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/10/2012
Control Number
2012-004
Agenda Item Number
12.J.1
Entity Name
Kimley-Horn and Associates
Subject
Work Order No.1 Membrane Replacement North RO skids 1 & 2
Water Quality Evaluation
Area
North and South RO Water Treatment Plant
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
10566
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
data . <br /> Consultant will collect information and review documentation furnished by IRCU staff, <br /> consisting of skid operating historical data, membrane projections , projected and actual water <br /> quality data , and membrane specifications . <br /> Consultant will conduct a three day review of the two existing RO skids and two of the newer RO <br /> skids , consisting of collection of profile data , reviewing calibration and performance data on the <br /> flow meters ( orifice plates with pressure transmitters) , witness flow meter verification against <br /> clearwell fill rates and feedwater pump performance, review flow meter installations , startup <br /> membrane performance data, and historical trend data which may be available . Owner shall <br /> furnish startup data, shop drawings and cut-sheets of equipment installed , and calibration data of <br /> flow meters and conductivity transmitters . <br /> Consultant will discuss with Dow Filmtec the membrane performance differences observed <br /> between the older and newer membranes . <br /> Consultant will prepare a summary of findings and provide a recommendation of the next course <br /> of action beyond what is listed in phase 2 , if any, to take. Consultant will provide these <br /> recommendations in writing and attend one meeting to discuss findings . <br /> FINISH WATER STABILIZATION EVALUATION <br /> Task 2 — Evaluate Finish Water Stabilization Techniques <br /> Consultant will review reports and historical information (Carollo Reports May 2006 , Feb 2011 , <br /> AWC SEM & FT - IR Nov 2011 Report) on corrosion issues related to both the North and South <br /> RO water plants . <br /> Consultant will meet with IRC Utilities staff to define finish water quality goals which are <br /> consistent and aligned with finish water stabilization techniques . Table 2 of the May 2006 <br /> Carollo report will be used as the basis for this task. <br /> Consultant will evaluate alternative membranes which may provide enhanced permeate alkalinity <br /> and hardness . Consultant will evaluate membrane selection with up to two membrane suppliers . <br /> Consultant will evaluate two (2 ) finish water stabilization techniques to enhance both hardness <br /> and alkalinity . Consultant will define the elements of each , advantages and disadvantages of <br /> each, and opinions of cost to implement at each facility and provide a sununary table of these <br /> alternatives . <br /> Consultant will evaluate a reduction in blend ratios which will affect product water quality . A <br /> reduction in blending of raw water may be needed to achieve a reduction in finish water system <br /> THM/HAA ' s that are consistent with IRCU ' s stage 2 disinfection byproduct study . Since a <br /> reduction in blend ratios will affect plant capacities , blend ratios reductions will only be evaluated <br /> to the extent of increasing RO production or recovery to offset these reductions . <br /> Consultant will prepare a summary report of our findings , submit electronic copies to IRCU staff <br /> for review, and attend one meeting to discuss these findings . <br /> K :AWPB Civil\Genera]\Miller\Indian River County\Hobart Membrane Replacement rev3 with FW Stabilization . doexPage 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.