Laserfiche WebLink
Wmley-Horn <br /> and Associates, Inc. <br /> consisting of 2 blind duplicate samples and. 2 equipment blanks will be collected pursuant to the <br /> FDEP's SOP. The ground water samples will be analyzed on a normal. (7 to 10-day) turnwaround <br /> time. <br /> Task 2 — Ground Water Monitoring Report <br /> Upon receipt of the laboratory data, KHA will prepare and submit a Site Assessment Status <br /> Report to the FDEP. The report will summarize the methodology and results . of the additional <br /> ground water sampling. The Site Assessment Status Report will include the following: <br /> • A. description of the methodologies employed for the additional sampling: <br /> • A discussion of the groundwater quality data collected from the Site. <br /> • Tabular summaries of the ground water quality data. <br /> • Tabular summary �of the depth to ground water measurements. <br /> • Scaled drawings depicting the location, of the existing and proposed <br /> monitoring wells. <br /> • Scaled ground water contour maps. <br /> • Copies of the laboratory analytical data. <br /> The report will be signed and sealed by a Professional Geologist licensed in the State of Florida. <br /> The County will be provided with three hard copies and one electronic copy of the report. <br /> Additionally, one hard copy and one electronic copy of the report will be submitted to the FDEP. <br /> For the Additional Services set forth above in Tasks i and 2, Client shall pay Consultant the lump <br /> sum . labor amount of $8500.00, exclusive of sampling expenses. Expenses are anticipated to be <br /> approximately $3000.00. <br />