Laserfiche WebLink
Exhibit I <br /> Work Order Number 2 <br /> Stormwater Supply to Algal Turf Scrubber System <br /> South RO Plant Concentrate Disposal <br /> Protect Description <br /> The Indian River County Department of Utility Services (IRCDUS ) has been issued an <br /> industrial wastewater permit for disposal of the South reverse osmosis ( RO) plant <br /> concentrate with stormwater to a proposed Algal Turf Scrubber (AT ST^^) system to be <br /> located at the solid waste transfer facility. This element consists of construction of a <br /> stormwater pipeline from the 27t1i Avenue SW future pump station to the proposed ATS <br /> site located adjacent to the Indian River Farms South Relief Canal . The general corridor <br /> consists of approximately 12 , 00M of 24 - inch pipeline along 5 "' Street SW, including <br /> connection to the RO concentrate ( ROC) pipeline from the RO water plant . The existing <br /> 14- inch ROC pipeline will be replaced with approximately 98M of 12 - inch pipeline due <br /> to the age and poor condition of the existing fiberglass pipe . <br /> SCOPE OF SERVICES <br /> The Consultant will provide survey, pot- holing , design , hydraulic analysis , and <br /> construction phase services for the proposed stormwater supply pipeline from the <br /> stormwater pump station located at 271x' Avenue SW and the South Relief Canal to the ATS <br /> site , and the replacement of existing ROC pipeline . The stormwater pipe route will be <br /> constructed along the 5 "' Street corridor and connect to the ROC line which will be <br /> replaced from the RO plant to 5 "' Street SW . It is understood that the existing ROC line <br /> between 5 "' Street SW and the South Relief Canal will not be replaced but will remain . <br /> The Consultant will provide survey services from the stormwater pump station at 27' x' <br /> Avenue , south to 5 "' Street SW , east to 8 '" Avenue SW , then north to the ATS site . Survey <br /> services will also be provided for the RO concentrate pipeline corridor from the RO water <br /> plant to 5 '" Street SW . The design of the stormwater and ROC pipeline will consist of <br /> preparation of project drawings and specifications for the project, which can be advertised <br /> for bidding by general contractors . The Consultant will provide construction phase <br /> services during construction . <br /> Consultant will also conduct hydraulic analysis of the piping system, and evaluate <br /> mechanical impacts to the existing RO plant . It is assumed that the residual pressure <br /> available at the RO plant will be adequate to overcome the hydraulic losses in the new <br /> stormwater and ROC pipelines and that the final design will not need a booster pu►np <br /> station . <br /> The Scope of Services for Work Order #2 consists of the following : <br /> K :\WPB_Civil\044572020 - IRCU Membrane&WQ Eval\SRO Brine Disposal\ATS Pipeline Project - Work Order 2 <br /> REV2 . doc Page 1 of 9 <br />