• Hydraulics of the new 12 - inch concentrate pipe and combined 24- inch stormwater <br /> piping <br /> Consultant will provide recommendations for the modifications to the existing RO system <br /> which may be necessary. The Consultant will prepare a brief technical memorandum to <br /> IRCU with the results of these evaluations , and attend up to one meeting to discuss the <br /> findings . <br /> Task 2 . 2 — ROC Pipe and 24 -inch Stormwater Pipeline Design <br /> The Consultant will prepare design drawings of the proposed stormwater piping . Existing <br /> utility information provided by IRCU and others will be used in conjunction with the <br /> survey and underground locate information as a basis for design of the piping alignment . <br /> Technical specifications will be based on the Owners current Utility Standards . <br /> Preparation of final construction drawings will consist of plan sheets with survey <br /> information, key sheets , and details . The forcemain design drawings will be plan view <br /> only (no profile ) with 1 - inch= 404eet scale , 24" x 36 " drawings with a two -pane view , <br /> with exception of up to six plan and profile drawings for the locations that cross <br /> intersections or canals . Detailed drawings of specific construction items that may be <br /> required for this project will be provided on one sheet . IRCU Standard detail sheets will <br /> consist of up to three sheets . There will be approximately 16 drawings , which will consist <br /> of the following sheets : <br /> 0 Cover with site location map , one ( 1 ) sheet <br /> • Overall project , one ( 1 ) sheet <br /> • Horizontal plan views of alignment , eight ( 8 ) sheets <br /> • Plan and profiles for intersections and canal crossings , two (2 ) sheets <br /> • Specific details , one ( 1 ) sheet <br /> • IRCU standard details , three ( 3 ) sheets <br /> It is understood that the stormwater pump station and the local piping at the ATS system <br /> will be designed by others and that the Consultant will be provided with information <br /> regarding the tie - in locations at both sites . <br /> Consultant will attend the following meetings to discuss the objectives and progress of the <br /> project and design requirements specific to this project : <br /> • Kick - off meeting <br /> 0 Progress meeting at 90% completion <br /> The Consultant will submit an updated opinion of probable construction costs ( OPC) and <br /> four ( 4) full size sets of drawings at 90% completion and final completion . The revisions <br /> to the pipeline design requested by the Owner will made based on comments received by <br /> the Consultant at the meetings , described above . <br /> K :\WPB_Civil\044572020 - IRCU Membrane&WQ Eval\SRO Brine Disposal\ATS Pipeline Project - Work Order 2 <br /> REV2 . doc Page 3 of 9 <br />