My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-221
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 11:58:29 AM
Creation date
10/1/2015 4:50:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/18/2012
Control Number
2012-221
Agenda Item Number
8.F.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Amendment No. 4 Services
Oslo Road Bridge Replacements & Roadway Widening
Area
41st. Street
Supplemental fields
SmeadsoftID
11634
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County, Amendment No. 4 <br /> Oslo Road Bridge Replacements and Roadway <br /> Widening <br /> 4 . Shop Drawings and Samples associated with the construction of the 41 " Street <br /> bridge will be reviewed by the ENGINEER. All other shop drawings are to be <br /> reviewed and approved by the COUNTY . The ENGINEER, as requested, will <br /> address questions or requests for additional information on unforeseen <br /> construction issues that may arise with regards to the 41St bridge construction. <br /> 5 . The ENGINEER will provide structural engineering support services associated <br /> with the 33rd Street and 37th Street bridges consisting of the following : <br /> • Pile driving analyzer (PDA) load testing <br /> • Monitor test pile and production pile driving <br /> • Analyze test pile results <br /> • End bent reinforcing steel and form work inspection <br /> • Superstructure deck steel and form work inspection <br /> • Barrier wall steel and form work inspection <br /> • Approach slab reinforcing steel and form work inspection <br /> • Load rating certification <br /> • As-built drawing review <br /> All other inspections and testing will be conducted by the COUNTY. <br /> 6 . Applications for Payment. All applications for payment will be reviewed and <br /> approved by the COUNTY. <br /> 7 . Final Notice of Acceptability of the Work. The County will be responsible for <br /> project acceptance, as-built drawing review and permit certifications . <br /> 8 . Limitation of Responsibilities . The ENGINEER shall not be responsible for the <br /> acts or omissions of any Contractor, or of any of their subcontractors, suppliers, or <br /> of any other individual or entity performing or furnishing the Work. The <br /> ENGINEER shall not have the authority or responsibility to stop the work of any <br /> Contractor. <br /> 9 . The ENGINEER will provide load rating calculations for the proposed bridge at <br /> 41St Street. <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.