My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-007A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-007A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2015 9:37:49 AM
Creation date
10/1/2015 5:10:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/15/2013
Control Number
2013-007A
Agenda Item Number
8.D.
Entity Name
KSM Engineering
Subject
South County Regional Park Multi-Purpose Fields
Area
South County Regional Park
Project Number
1126
Supplemental fields
SmeadsoftID
11776
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KSM <br /> KELLER , SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING , INC . <br /> MARTIN (772) 337-7755 PO, BOX 7$_1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 <br /> PALM BEACH (561 ) 845-7445 www.ksmengineering.net MELBOURNE (321 ) 768-8488 <br /> FAX (561 ) 845-8876 &Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093 <br /> C.A. : 5693 FAX (772) 589-6469 <br /> Multipurpose Athletic Field -2- December 27 , 2012 <br /> South County Park <br /> Indian River County , Florida <br /> ROADWAYS AND PARKING AREAS No . of Tests Amount <br /> 1 ) Stabilized Subgrades <br /> Density Tests @ $20. 00 35 $ 700.00 <br /> 4-5 Point L. B. R. 's @ $250 . 00 3 $ 750. 00 <br /> Modified Proctors @ $75. 00 2 $ 150. 00 <br /> 2 ) Rock Base <br /> Density Tests @ $20 . 00 35 $ 700.00 <br /> 4-5 Point L. B . R . 's @ $250. 00 3 $ 750. 00 <br /> Modified Proctors @ $75. 00 2 $ 150. 00 <br /> ** Total = Roadways and Parkins Areas $ 31200.00 <br /> SOIL BORINGS AND MOBILIZATION No. of Tests Amount <br /> 1 ) Location of Boring Soil Borings <br /> Building Pads 14' Deep @ $ 10. 00/ft 4 $ 560 . 00 <br /> Pavilions 10' Deep @ $ 10. 00/ft 8 $ 800. 00 <br /> Light Poles 30' Deep @ $ 10. 00/ft (20/ft) 6 $ 1 , 200. 00 <br /> $ 12450/ft ( 10/ft) 6 $ 750. 00 <br /> Light Poles, Lift Stations 20' Deep @ $10. 00/ft 5 $ 1 , 000. 00 <br /> 2 ) Mobilization Mobilization @ $ 125. 00 each 3 $ 375. 00 <br /> 3 ) Project Engineer Time Engineer Time @ $ 125 . 00/hr 10 Hrs $ 1 , 250 .00 <br /> Total - Soil Borings, Mobilization and Project Engineer Time $ 5,935.00 <br /> PERMEABILITY TESTING <br /> Perform one ( 1 ) constant head permeability test in the field . Also, obtain shelby tube soil samples <br /> and perform constant head horizontal and vertical permeability tests in our laboratory. Calculate the <br /> permeability coefficient `K' values and also estimate the normal wet-season and dry-season <br /> water tables. A report will be provided with the results of the constant head test and laboratory <br /> permeability tests. Perform one ( 1 ) soil profile to a depth of 14 feet in the <br /> existing water <br /> management area to classify the soils in accordance with the Unified Soil Classification System . <br /> ($ 575.00) <br /> Obtain four (4) shelby tube soil samples and perform constant head horizontal or vertical <br /> permeability tests in our laboratory on the imported storm drain backfill material . (4 @ $100. 00 ea. ) <br /> is 400.00)`: <br /> The specified investigation shall be completed along with two copies of our report mailed to your office after <br /> authorization to proceed is received. <br /> Ronald G. Keller, P.E.: 37293 / SI Lic. No. : 860 / Julie E. Keller, P.E.: 68366 <br /> r_ - <br />
The URL can be used to link to this page
Your browser does not support the video tag.