Laserfiche WebLink
1 <br />$1.80 <br />LOW -BIDDERS ANNUAL REQUIREMENTS <br />Page I <br />Slurry Seal <br />Oneman Engineering <br />$0.22 Square <br />MATERIALS <br />LOW BIDDER <br />BID PRICE <br />Type II Concrete Surface Materials <br />yp1 <br />Dickerson, Inc. <br />$0.95 Ton F.O.' <br />B.Vero Plant <br />Palm Beach Tank & <br />Culvert Company, Inc. <br />See <br />Attached <br />Tabulation <br />"C" <br />Aluminum Metal Pipe <br />Palm Beach Tank & <br />Hauling & Spreading Type II <br />Culvert Company, Inc. <br />See <br />Concrete Surface.1'-!,--terial6 <br />Dickerson, Inc. <br />$14.83 Ton <br />"011 Ring Rubber Concrete Pipe <br />, rD <br />Mitchell Concrete Pipe <br />Southern Pine Lumber (Piling) <br />Koppers Company, Inc. <br />.20 25' 301 ,tea <br />• Company <br />See <br />Attached <br />Tabulation <br />L.P. $1.30 $1.19 $1.15 $1.15 <br />"011 Ring Rubber Concrete Pipe <br />Nati6nal Pipe Co.. <br />See <br />Attached <br />Tabulation <br />"E" <br />Southern Pine Lumber <br />The Langdale Co. <br />See Attached Tabulation "A" <br />Pit Run Road Rock <br />Dixie Lime company <br />$2.98,Ton by Rail, FOB Vero <br />$4.30 Truck, <br />Road Rock Cover Material <br />Seminole Rock Products Inc <br />Grade 11 12 or 19 <br />$1.80 <br />Ton F.O.B. Miami <br />FEC <br />Slurry Seal <br />Oneman Engineering <br />$0.22 Square <br />Yard <br />Asphalt Coated Co--regated <br />Metal Pipe <br />Palm Beach Tank & <br />Culvert Company, Inc. <br />See <br />Attached <br />Tabulation <br />"C" <br />Aluminum Metal Pipe <br />Palm Beach Tank & <br />Culvert Company, Inc. <br />See <br />Attached <br />Tabulation <br />I'D$$ <br />"011 Ring Rubber Concrete Pipe <br />Elliptic <br />Mitchell Concrete Pipe <br />• Company <br />See <br />Attached <br />Tabulation <br />"E" <br />"011 Ring Rubber Concrete Pipe <br />Nati6nal Pipe Co.. <br />See <br />Attached <br />Tabulation <br />"E" <br />