My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-214A
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-214A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 11:22:17 AM
Creation date
10/1/2015 2:57:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/11/2011
Control Number
2011-214A
Agenda Item Number
8.H.
Entity Name
Lucas Marine Acquisition Co.
Subject
Bridge Replacement and Roadway Improvements
Area
82nd. Ave. at 4th St.
Project Number
0208
Bid Number
2011057
Supplemental fields
SmeadsoftID
10302
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
thereby ; however, CONTRACTOR shall not be liable 2 . 07 Initial Acceptance of Schedules <br /> to OWNER or ENGINEER for failure to report any <br /> conflict, error, ambiguity , or discrepancy in the A. Unless otherwise provided in the Contract <br /> Contract Documents unless CONTRACTOR knew or Documents , at least ten days before submission of the <br /> reasonably should have known thereof. first Application for Payment a conference attended by <br /> CONTRACTOR , ENGINEER , and others as appropri - <br /> B . Preliminary Schedules: Within ten days after ate will be held to review for acceptability to ENGk <br /> the Effective Date of the Agreement ( unless otherwise NEER as provided below the schedules submitted in <br /> specified in the General Requirements) , CONTRAC- accordance with paragraph 2 . 05 . 13 . CONTRACTOR <br /> TOR shall submit to ENGINEER for its timely review: shall have an additional ten days to make corrections <br /> and adjustments and to complete and resubmit the <br /> 1 . a preliminary progress schedule schedules . No progress payment shall be made to <br /> indicating the times ( numbers of days or dates ) CONTRACTOR until acceptable schedules are <br /> for starting and completing the various stages submitted to ENGINEER , <br /> of the Work, including any Milestones specified <br /> in the Contract Documents ; 1 . The progress schedule will be <br /> acceptable to ENGINEER if it provides an <br /> 2 . a preliminary schedule of Shop orderly progression of the Work to completion <br /> Drawing and Sample submittals which will list within any specified Milestones and the <br /> each required submittal and the times for sub- Contract Times . Such acceptance will not <br /> mitting , reviewing , and processing such impose on ENGINEER responsibility for the <br /> submittal ; and progress schedule , for sequencing , scheduling , <br /> or progress of the Work nor interfere with or <br /> 3 , a preliminary schedule of values for relieve CONTRACTOR from CONTRACTOR ' s <br /> all of the Work which includes quantities and full responsibility therefor. <br /> prices of items which when added together <br /> equal the Contract Price and subdivides the 2 . CONTRACTOR' s schedule of Shop <br /> Work into component parts in sufficient detail to Drawing and Sample submittals will be <br /> serve as the basis for progress payments acceptable to ENGINEER if it provides a <br /> during performance of the Work . Such prices workable arrangement for reviewing and <br /> will include an appropriate amount of overhead processing the required submittals . <br /> and profit applicable to each item of Work . <br /> 3 . CONTRACTOR' s schedule of values <br /> will be acceptable to ENGINEER as to form <br /> the Site is started , CONTRACTOR and OWNE all and substance if it provides a reasonable <br /> each deliver to the other, with copi o each allocation of the Contract Price to component <br /> additional insured identified in t upplementary parts of the Work . <br /> Conditions , certificates of � urance (and other <br /> evidence of insurance . . . . . ch either of them or any ARTICLE 3 - CONTRACT DOCUMENTS : INTENT , <br /> additional insur may reasonably request) which AMENDING , REUSE <br /> CONTRA and OWNER respectively are <br /> 3 . 01 Intent <br /> 2 . 06 Preconstruction Conference A. The Contract Documents are comple- <br /> mentary ; what is called for by one is as binding as if <br /> A, %Awfithi .n 20 days after the ContraGit TiMP. C.; 083# called for by all . <br /> to run , but before any Work at the Site i arted , a <br /> conference attended by CONTRACT ENGINEER , B . It is the intent of the Contract Documents to <br /> and others as appropriate wil held to establish a describe a functionally complete Project (or part there- <br /> working und einczj the parties aG to the of) to be constructed in accordance with the Contract <br /> Work and to disc a schedules referred to in para- Documents . Any labor, documentation , services , <br /> graph 2 . 05 . rocedures for handling Shop Drawings materials , or equipment that may reasonably be <br /> and er submittals , processing Applications for inferred from the Contract Documents or from <br /> nt <br /> prevailing custom or trade usage as being required to <br /> produce the intended result will be provided whether <br /> or not specifically called for at no additional cost to <br /> OWNER . <br /> 00700 - General Conditions REV 04-07. doc <br /> 00700 - 9 <br /> F . \Public Works\ENGINEERING DIVISION PROJECTS\0208-82nd Ave Bridge Replacement at 4th St\Admim\bid documents\00700 - General Conditions REV 04-07. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.