My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-075
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-075
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2015 12:09:44 PM
Creation date
10/1/2015 5:15:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/16/2013
Control Number
2013-075
Agenda Item Number
8.B.
Entity Name
Malcolm Pirnie Arcadis
Subject
Rockridge Subdivision Surge Protection Project
Work Order No. 5-RR Amendment No.3
Permitting Requirements
Area
Rockridge Subdivision
Supplemental fields
SmeadsoftID
11875
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> ATTACHMENT 1 to WORK ORDER NO. 5-R9 AMENDMENT No. 3 <br /> PROFESSIONAL ENGINEERING SERVICES for ADDITIONAL <br /> PERMITTING REQUIREMENTS for the <br /> ROCKRIDGE SUBDIVISION SURGE PROTECTION PROJECT <br /> INTRODUCTION/OVERVIEW <br /> Indian River County (the "County") has requested that Malcolm Pirnie , Inc . (the <br /> "CONSULTANT") perform additional environmental permitting services in order to <br /> secure a permit from the US Army Corps of Engineers ( USACE) . The additional <br /> USACE environmental permitting services — above the services approved by <br /> Amendments No . 1 and 2 of Work Order Number 5- 14R - are required because the <br /> environmental mitigation permitting issues associated with using County owned <br /> property ( Earman . Island) for this project , at the request of the USACE , are compounded <br /> because an abutting piece of property on the island is also being permitted for another <br /> County mitigation project (Oslo Boat Ramp) . Since the CONSULTANT submitted the <br /> proposed Rockridge mitigation plan to the USACE , the adjacent Oslo Boat Ramp <br /> mitigation plan was revised at the request of the USACE . The CONSULTANT must <br /> now revise the proposed Rockridge mitigation plan to accommodate the latest Oslo <br /> Boat Ramp mitigation plan and resubmit it to the USACE . This requires Work Order No . <br /> 5 - RR , Amendment No . 3 , to be issued for the associated additional engineering <br /> services related specifically to harmonize the activities of the two proposed mitigation <br /> sites . <br /> 1 . 0 ADDITIONAL ENVIRONMENTAL PERMITTING SERVICES <br /> Provide additional environmental permitting services as necessary to permit the <br /> Rockridge Surge Protection Project with the US Army Corps of Engineers , including but <br /> not limited to modifying the existing Rockridge mitigation plan so it reflects the latest <br /> Oslo Boat Ramp mitigation plan revisions . The activities to address the requirements of <br /> the USACE will require additional manhours by the CONSULTANT to acquire the <br /> USACE permit necessary for this project <br /> * * END OF ATTACHMENT 1 ** <br /> 2 <br /> C :\Users\rawlingspWppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\LTFDOVUBWmendment 3 to WO <br /> 5-RR - 4=2-2013.doc <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.