Our File # 0831 LG <br /> June 27 , 2011 <br /> NON -EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> CONTINUING CONSULTING SERVICES <br /> AMENDMENT # 1 TO W0# 13 <br /> " EXHIBIT 1 " <br /> The Indian River County Utilities Department has decided to amend Work Authorization # 13 <br /> which was approved by the Board of County Commissioners on October 21 , 2008 . The original <br /> project involved Engineering Services in connection with conversions of an existing 16" brine <br /> main , an existing 12 " force main , and an existing 12 " potable water main to reuse mains . The <br /> Brine Main Project' s design/as- built drawings were used to design the proposed connection <br /> between the brine line and force main just west of the beginning of the Wabasso Causeway (SR <br /> 510 ) . The original design plans for the brine line reveal the existing force main to be located to <br /> the south of an existing Johns Island irrigation main and next to the existing brine mains . In the <br /> field , however , Contractor' s excavations have revealed thhe f,,��"" a ai to be located north of the <br /> existing irrigation main and under the existing SR .n ei�sW i banes . The irrigation mains <br /> position between the existing brine main and force main requires a change to the proposed <br /> connection between reuse facilities . This Amendment , therefore , provides for Engineering <br /> Services to modify the design of the brine/force main and brine/water connections including <br /> structural engineering for design of pipe stanchions to support 12 " , 16 " , and 18" diameter pipes <br /> to be placed on the most westerly headwall beneath the Wabasso Causeway . The additional <br /> services covered by this Amendment # 1 to the project will generally consist of the following <br /> revisions to the original project : <br /> • Scope of Services <br /> L DESIGN SERVICES <br /> Task A — Reuse Main Improvements <br /> 1 . Conversion of Existing Mains into Reuse Mains <br /> Masteller & Moler , Inc . will provide for the necessary modifications to the Contract <br /> Construction Plans covering the following project Modifications and Additions : <br /> d . Modify the design of the brine to force main connection and brine to water main <br /> connection to all be converted into reuse mains at the west Wabasso Causeway <br /> Bridge . Design modification will require structural engineering services to be <br /> completed by ML Engineering . <br /> Ill. PERMITTING SERVICES <br /> Task A (d ) — Brine to WM / FM Connections <br /> Coordinate with the FDOT to obtain a permit modification for the revised design . <br />