My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-155
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 2:19:23 PM
Creation date
10/1/2015 2:43:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
07/12/2011
Control Number
2011-155
Agenda Item Number
12.J.1
Entity Name
Masteller & Moler
Subject
Amendment No.1 to Work Order No.13 Wabasso Causeway
Area
Wabasso Causeway
Supplemental fields
SmeadsoftID
10050
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Our File # 0831 LG <br /> June 27 , 2011 <br /> NON -EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> CONTINUING CONSULTING SERVICES <br /> AMENDMENT # 1 TO W0# 13 <br /> " EXHIBIT 1 " <br /> The Indian River County Utilities Department has decided to amend Work Authorization # 13 <br /> which was approved by the Board of County Commissioners on October 21 , 2008 . The original <br /> project involved Engineering Services in connection with conversions of an existing 16" brine <br /> main , an existing 12 " force main , and an existing 12 " potable water main to reuse mains . The <br /> Brine Main Project' s design/as- built drawings were used to design the proposed connection <br /> between the brine line and force main just west of the beginning of the Wabasso Causeway (SR <br /> 510 ) . The original design plans for the brine line reveal the existing force main to be located to <br /> the south of an existing Johns Island irrigation main and next to the existing brine mains . In the <br /> field , however , Contractor' s excavations have revealed thhe f,,��"" a ai to be located north of the <br /> existing irrigation main and under the existing SR .n ei�sW i banes . The irrigation mains <br /> position between the existing brine main and force main requires a change to the proposed <br /> connection between reuse facilities . This Amendment , therefore , provides for Engineering <br /> Services to modify the design of the brine/force main and brine/water connections including <br /> structural engineering for design of pipe stanchions to support 12 " , 16 " , and 18" diameter pipes <br /> to be placed on the most westerly headwall beneath the Wabasso Causeway . The additional <br /> services covered by this Amendment # 1 to the project will generally consist of the following <br /> revisions to the original project : <br /> • Scope of Services <br /> L DESIGN SERVICES <br /> Task A — Reuse Main Improvements <br /> 1 . Conversion of Existing Mains into Reuse Mains <br /> Masteller & Moler , Inc . will provide for the necessary modifications to the Contract <br /> Construction Plans covering the following project Modifications and Additions : <br /> d . Modify the design of the brine to force main connection and brine to water main <br /> connection to all be converted into reuse mains at the west Wabasso Causeway <br /> Bridge . Design modification will require structural engineering services to be <br /> completed by ML Engineering . <br /> Ill. PERMITTING SERVICES <br /> Task A (d ) — Brine to WM / FM Connections <br /> Coordinate with the FDOT to obtain a permit modification for the revised design . <br />
The URL can be used to link to this page
Your browser does not support the video tag.