My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-164
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-164
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2015 10:05:59 AM
Creation date
10/1/2015 5:32:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/20/2013
Control Number
2013-164
Agenda Item Number
12.J.2
Entity Name
Masteller & Moler
Subject
Work Order No. 6
Sewer Feasibility Study North Sebastian Area
Area
US Highway 1, Indian River Lagoon, North limit Indian River Dr.
Supplemental fields
SmeadsoftID
12166
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MM File # 1351 <br /> August 12 , 2013 <br /> NON -EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> CONTINUING CONSULTING SERVICES <br /> " EXHIBIT 1 " <br /> SEWER FEASIBILITY FOR NORTH SEBASTIAN AREA <br /> ( Scope of Work) <br /> • Project Description <br /> Masteller & Moler , Inc . ( MM ) is pleased to present you with Work Order #6 which provides <br /> for professional engineering services for the preparation of a Sewer Feasibility Study and <br /> Report related to the replacement potential for septic tank uses along or within close <br /> proximity to the Indian River Lagoon . The Feasibility Study and Report will cover an area <br /> generally described as having a western limit of US Highway # 1 , an eastern limit of <br /> the <br /> Indian River Lagoon , the Northern Limit of Indian River Drive connection to US Highway <br /> # 1 , and the Southern Limit as Main Street . <br /> There are numerous benefits to be gained by construction of a sanitary sewer collection <br /> and conveyance system in the study area . One primary benefit is the elimination of <br /> numerous existing septic systems which result in pollution of the groundwater table and <br /> ultimately pollution of the Indian River Lagoon to the east . Also , in many cases these <br /> septic systems represent inconvenience and expense to the homeowners due to their <br /> malfunction . Another primary benefit of the sanitary sewer collection and conveyance <br /> system construction in the study area is the ability for many commercial areas to be <br /> developed without the constraints caused by the use of septic systems . The presence of a <br /> sanitary sewer collection and conveyance system in areas zoned for commercial uses will <br /> enhance the likelihood of development . <br /> A brief description of the scope of services and deliverables for this Work Order is provided <br /> below : <br /> • Scope of Services <br /> The Sanitary Sewer Feasibility Study will result in a comprehensive bound report which can <br /> be used as a resource and design tool for future phases of the project' s implementation . <br /> Masteller & Moler , Inc . will conduct site visits to the study area as necessary , collect and <br /> analyze all available data and utilize the information to develop the most cost effective and <br /> reliable sanitary sewer collection and conveyance system to serve the study area . <br /> The Report will contain a discussion and exhibit of existing conditions including the extent <br /> of existing sanitary sewers , as well as the general location of residential and commercial <br /> areas . The exhibit will also show the nature and location of existing man - made <br /> improvements through the use of aerial photography . <br />
The URL can be used to link to this page
Your browser does not support the video tag.