My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-038
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 10:59:32 AM
Creation date
10/1/2015 5:59:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/08/2014
Control Number
2014-038
Agenda Item Number
8.D.
Entity Name
Masteller & Moler
Subject
Blue Cypress Wastewater Treatment Plant
Work Order Number 5
Supplemental fields
SmeadsoftID
13072
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br />CONTINUING CONSULTING SERVICES <br />"EXHIBIT 1" <br />(Fee Schedule) <br />Method and Amount of Compensation <br />MM File #1341 <br />Masteller & Moler, Inc. proposes to provide Word Order No. 5 Scope of Services based on the <br />following lump sum fees: <br />1. Prime Consultants Fee <br />• Primary Consulting Engineering Services by Masteller & Moler, Inc. including <br />Task C $ 6,000.00 <br />• Project Bidding Services per Task D <br />$ 1,000.00 <br />• Periodic Construction Observation and Administrative Services per Task E <br />$ 1,500.00 <br />2. Sub -Consultants Fees <br />• Surveying Services per Task A by Masteller, Moler, Reed & Taylor, Inc. <br />(No Administration Multiplier) $ 950.00 <br />• Structural Engineering Services per Task B by ML Engineering, Inc. <br />($ 7,450.00 x 1.15)* $* 7,762.50 <br />*(Note: Structural Engineering Services fee includes construction observation <br />services.) <br />(Exhibit l b-FeeScheduie_13-0807) <br />
The URL can be used to link to this page
Your browser does not support the video tag.