My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-183
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2015 1:32:40 PM
Creation date
10/1/2015 5:34:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/17/2013
Control Number
2013-183
Agenda Item Number
8.O.
Entity Name
Masteller & Moler, Inc.
Subject
Amendment No. 1 to Work Order No. 6
Sewer Feasibility Study
Area
North Sebastian Area
Supplemental fields
SmeadsoftID
12282
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Our File # 1351 <br /> 9/5/2013 <br /> NON -EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> CONTINUING CONSULTING SERVICES <br /> AMENDMENT # 1 TO WO #6 <br /> " EXHIBIT 1 " <br /> SEWER FEASIBILITY FOR NORTH SEBASTIAN AREA <br /> (Scope of Work) <br /> • Project Description <br /> Masteller & Moler, Inc . (MM ) is pleased to present you with Amendment # 1 to Work Order #6 <br />. <br /> Work Order #6 was approved by the Board of County Commissioners on August 20 , 2013 , Work <br /> Order #6 provides for professional engineering services in connection with preparation of a Sewer <br /> Feasibility Study and Report related to replacement of septic tank systems along or within close <br /> proximity to the Indian River Lagoon . The Feasibility Study and Report covered an area generally <br /> described as having a western limit of US Highway #, 1 , an eastern limit of the Indian River Lagoon , <br /> the Northern Limit of Indian River Drive connection to US Highway # 1 , and the Southern Limit as <br /> Main Street. <br /> Amendment # 1 to Work Order #6 covers a study area to be added to the Feasibility Study and <br /> Report. The additional study area borders the southern shore line of the Saint Sebastian River . <br /> This study area is presently developed with residential uses served by existing septic systems . The <br /> study area can be described as the community of Ercildoune Heights plus approximately 100 acres <br /> north of Roseland Road bordered by Kelso Place on the east , 128th Court to the west, Roseland <br /> Road to the south , and the shoreline of the Saint Sebastian River to the north . Consistent with the <br /> objective of original Work Order # 6 , the Feasibility Study and Report amended by the inclusion of <br /> this study area will provide design and cost information for the construction of a sanitary sewer <br /> gravity system to replace the existing septic systems . Pollution of groundwater by existing septic <br /> systems that migrates into the Saint Sebastian River will be eliminated due to the construction of <br /> these sanitary gravity sewers . <br /> + Scope of Services <br /> The Scope of Services as originally outlined in Work Order #6 will also apply to this Amendment # 1 . <br /> Even though the two (2 ) study areas (the original study area as covered under Work Order #6 and <br /> the additional study area as covered under this Amendment # 1 ) are not contiguous , the report will <br /> evaluate the two (2 ) study areas as one ( 1 ) project . The objective of eliminating the use of septic <br /> systems which cause pollution of the Indian River Lagoon and Saint Sebastian River is a common <br /> goal of both study areas . It is anticipated that the Sanitary Sewer Feasibility Study and Report will <br /> be used as a key element in making application for future funding assistance needed to construct <br /> this much needed sewer project . <br />
The URL can be used to link to this page
Your browser does not support the video tag.