My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-091 (2)
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-091 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2015 11:01:35 AM
Creation date
10/1/2015 5:16:54 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/14/2013
Control Number
2013-091
Agenda Item Number
12.J.1
Entity Name
Masteller and Moler, Inc.
Subject
Work Order No.3` Contract Agreement
Sludge Holding Tank Modifications
Area
Central Regional Wastewater Plant
Supplemental fields
SmeadsoftID
11895
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MM File # 1305 <br /> NON -EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> CONTINUING CONSULTING SERVICES <br /> " EXHIBIT 1 " <br /> (Scope of Work) <br /> • Project Description <br /> Work Order No . 3 provides for professional engineering services for the surveying , <br /> design , permitting , bidding , and construction services for the Central Regional <br /> Wastewater Treatment Plant' s Sludge Holding Tank modifications . <br /> The work to be performed as part of this Work Order will generally include providing <br /> a survey and base plans ; preparation of project design and demolitions for the <br /> proposed tank modifications , preparation of contract plans ; preparation of <br /> specifications and bid documents ; preparation and submittal of permit applications , <br /> assistance during bidding and contract administration/periodic inspection for the <br /> project . <br /> The estimated Construction Cost for the Utility Improvements covered in the Scope <br /> of Services for Work Order No . 3 is $ 400 , 000 . 00 <br /> A brief description of the scope of services and deliverables for Work Order No . 3 is <br /> provided below: <br /> • Scope of Services <br /> Task A —Surveying Services <br /> Masteller, Moler , Reed & Taylor, Inc . will perform surveying services of existing <br /> conditions covering the project area showing improvements and necessary <br /> elevations and topo . <br /> Task B - Structural Enaineerina Services <br /> Masteller & Moler, Inc . will provide for structural engineering services to inspect the <br /> existing sludge holding tanks and provide a brief written report of observations <br /> concerning the structural integrity of the tanks and design structural support system <br /> for tank truck filling pipe . <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.