Laserfiche WebLink
EXHIBIT " A " <br /> AGREEMENT FOR PROFESSIONAL SERVICES <br /> Work Order No . <br /> ( Engineering/Survey) Continuing Professional Surveying and Mapping/GIS Services Contract # 1032 <br /> Indian River County Project # 1205 <br /> 8 ) Contact Utility locating service and have all underground utilities , such as cable TV , phone , electric , <br /> water and sewer lines marked within Right of Way limits . Locate and identify all markings as <br /> applicable . <br /> 9 ) Process field data and determine limits of existing 87th Street Right of Way . Prepare survey drawing <br /> in accordance with Minimum Technical Standards including cover sheet with location sketch , <br /> certifications , related title and project number, notes , legend , abbreviations and plan view sheets . <br /> Prepare final deliverables . <br /> Time of Completion and Deliverables : <br /> 10) Time of final completion shall be 60 calendar days from notice to proceed . <br /> 11 ) Deliverables : <br /> a ) Final review shall include one 100 % " Paper" copy be submitted prior to the Final Deliverables . <br /> b ) Address comments as applicable . <br /> c) FINAL — Five ( 5 ) paper " hardcopy" signed and sealed set and one ( 1 ) signed and sealed <br /> MYLAR set in adequate recording fashion ( I . E . Borders) . Sheeted and model space (as <br /> applicable) AutoCAD drawing file and PDF formats on CD . <br /> • Survey set/sheets shall include a cover sheet with location sketch , survey certifications , and <br /> related title and project number; survey notes/legend/abbreviation sheet , and right-of-way <br /> plan view sheets . <br /> Compensation . <br /> Payments shall be in accordance with the original Professional Surveying and Mapping/GIS Services <br /> Agreement , Contract No . 1032 with the Indian River County . <br /> I . Project initiation , including review of existing deeds and surveys , files and field <br /> notes , preparation of work orders and field crew folders . Find , recover and measure field <br /> ties into existing survey control along the route to establish the 87"' Street Right of Way <br /> and Baseline of Survey . Find , recover and measure field ties from Baseline of Survey to <br /> existing GPS 23 and GPS 24 monuments as applicable . Horizontal Control shall be based <br /> upon the State Plane Coordinate System , Florida East Zone , NAD 83 . Find and recover <br /> existing vertical control . Elevations hall be based upon the National Geodetic Vertical <br /> Datum of 1929 ( NGVD 29) with a conversion to the North American Vertical Datum of <br /> 1988 ( NAVD 88 ) provided . Perform bench run and establish benchmarks along the <br /> survey corridor at maximum 1000 foot intervals . Field monument baseline control , <br /> including at a minimum , one control point for each existing side street. <br /> Surveyor 2 hours @ $ 120 . 00 /hr $ 240 . 00 <br /> Field Supervisor 4 hours @ $ 90 . 00 / hr $ 360 . 00 <br /> Survey Technician 5 hours @ $ 75 . 00/hr $ 375 . 00 <br /> Administrative 2 hours @ $ 40 . 00/hr $ 80 . 00 <br /> Survey Crew 32 hours @ $ 115 . 00 /hr $ 3 , 680000 <br /> Total I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4 , 735 . <br />00 <br /> Masteller, Mo/er, Reed & Taylor, Inc. <br /> 1655 27th Street, Suite 2 <br /> Vero Beach , FL 32960 <br /> Phone : 772-564-8050 , Fax : 772494-0647 <br /> Q e-mail : dt5243@bellsouth . net <br /> I ' <br />