Laserfiche WebLink
IRC Work Order #1 <br />Old Dixie Highway/Highlands Drive <br />Project #1362 <br />Page 1 of 3 <br />Board of County Commissioners <br />Administration - Building A (South) <br />1801 27th Street <br />Vero Beach, Florida 32960 <br />Telephone: (772) 567-8000 FAX: 772-778-9391 <br />Project: <br />Old Dixie Highway/Highlands Drive <br />Indian River County Project #1362 <br />WORK ORDER NO 1 (Engineering/Surveying) <br />FOR <br />PROFESSIONAL SERVICES AGREEMENT <br />ANNUAL SURVEYING and MAPPING/GIS SERVICES <br />WITH <br />Masteller, Moler, Reed & Taylor, Inc. <br />In accordance with Contract No. 1333 2013-2014 <br />Ps, <br />onoy•o7/ <br />This Work Order No. 1 is in accordance with the existing AGREEMENT dated October 1st, 2013 <br />between Masteller, Moler, Reed & Taylor, Inc. (SURVEYOR) and Indian River County <br />(COUNTY). This Work Order No. 1 amends the agreement as follows: <br />S ECTION I - PROJECT LIMITS <br />This Work Order No. 1 is for the SURVEYOR to perform surveying services to establish Right of <br />Way and perform a Topographic Survey of Highlands Drive from the F E C Railroad to 450 feet <br />west of Old Dixie Highway including 100 feet each way on side streets and the FEC railroad. <br />The survey limits shall also extend 1,100 feet north and south of Highlands Drive along Old <br />Dixie Highway The approximate length of the nght of way limits is 3,340 linear feet (0.63 <br />miles) <br />S ECTION II - SCOPE OF SERVICES <br />As agreed upon between Masteller, Moler, Reed & Taylor, Inc. and Indian River County, the <br />S URVEYOR shall provide Professional Land Surveying services to complete all tasks as <br />outlined in this Work Order No 1; specifically detailed in the attached Exhibit A <br />S ECTION III - TIME FOR COMPLETION & DELIVERABLES/WORK PRODUCT <br />1. Project shall be completed as follows: <br />a. 100 % "Paper" review submittal (final review prior to final deliverables) shall be made <br />within 45 calendar days of receipt of Notice to Proceed for review by County Staff <br />pnor to prepanng final submittal package. <br />b. Time of Final project completion shall be within 10 calendar days of receipt of the <br />County s review comments from the 100% paper submittal. <br />s:\documents\work orders\irc #1333 - work orders\1333_irc_wo#1_highlands-drive.doc <br />