My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-114
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 1:25:12 PM
Creation date
10/1/2015 2:37:54 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/17/2011
Control Number
2011-114
Agenda Item Number
8.D.
Entity Name
Masteller Moler Reed and Taylor
Subject
Trans Florida Railroad Corridor
Area
104th Ave. to Sebastian River Middle School
Project Number
0923B
Supplemental fields
SmeadsoftID
9913
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT " A" <br /> AGREEMENT FOR PROFESSIONAL SERVICES <br /> Work Order No . 1 <br /> ( Engineering/Survey) Continuing Professional Surveying and Mapping/GIS Services Contract # 1032 <br /> Indian River County Project # 0923B <br /> 24 hours @ $ 75 . 00 /hr . 11111 1 . . . . . . . . . .. . . 1 . $ 1 , 800 . 00 <br /> Total II . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 2 , 520 . 00 <br /> III . Monument property corners as required and prepare Boundary of survey limits <br /> prepared in accordance with the Minimum Technical Standards for surveying as <br /> adopted by the State of Florida and per the Project Boundary Map requirements as <br /> set forth by the Recreational Trails Program ( copy attached ) . Prepare survey set <br /> sheets , including cover sheet with location sketch , certifications , related title and <br /> project number, notes , legend , abbreviations and plan view sheets in AutoCad format . <br /> Scale 1 "=40 ' . <br /> Surveyor <br /> 6 hours @ $ 120 . 00 /hr . . . . . . . . . . . . . . . . . . . . . . . . $ 720 . 00 <br /> Survey Technician <br /> 20 hours @ $ 75 . 00/hr . . . . . . . . . . . . . . . . . . . . . $ 19500 . 00 <br /> Survey Crew ( 2 men ) <br /> 6 hours @ $ 115 . 00/hr . . . . . . . . . . . . . . . . . . . . . . . . . $ 690 . 00 <br /> TotalIII . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Total I — III . amen among " mom some . . . . . . . . . . . . . . . . mom $ 99710 . 00 ( Lump Sum ) <br /> IV. Find and recover existing vertical control . Perform bench run and establish <br /> benchmarks along the survey corridor at maximum 1000 foot intervals . Elevations <br /> shall be based upon the National Geodetic Vertical Datum of 1929 ( NGVD 29 ) with a <br /> conversion to the North American Vertical Datum of 1988 ( NAVD 88) provided . <br /> Surveyor <br /> 1 hours @ $ 120 . 00/hr . . . . . . . . . . . . . . . . . . . . . . . $ 120 . 00 <br /> Field Supervisor <br /> 2 hours @ $ 90 . 00/hr . . . . . . . . . . . . . . . . . . . . . . . . $ 180 . 00 <br /> Survey Crew ( 3 men ) <br /> 16 hours @ $ 130 . 00/hr . . . . . . . . . . . . . . . . . . . . . . $ 2 , 080 . 00 <br /> Total IV . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 2 , 380 . 00 <br /> V . Field observe and record vertical ground elevations cross sections and all specific <br /> points and changes in contour within the right of way corridor and side streets . Field <br /> locate and record existing building structures footprint ( roadway face only) , all man - <br /> . Masteller, Moler, Reed & Taylor, Inc. <br /> - 1655 27th Street, Suite 2 <br /> _y Vero Beach , FL 32960. <br /> Phone : 772-564-8050 <br /> Fax: 772-794-0647 <br /> e-mail : dt5243@bellsouth . net <br />
The URL can be used to link to this page
Your browser does not support the video tag.