Laserfiche WebLink
Task <br />Hourly Rate Components <br />41ane/2 lane Roadway Transition <br />Geotechnical Investigation <br />Retention Pond Design <br />Phosphorus Mitigation <br />Landscape Details/Maintenance <br />Utility Location Survey <br />Utility Soft -dig Location Survey <br />(drainage design) (83 @ $450) <br />Utility Soft -dig Location Survey <br />(reuse/stub-outs) (77 @ $450) <br />MOT for Utility Soft -dig <br />(8 set-ups @ $2,000) <br />MOT for Utility Soft -dig <br />(6 set-ups @ $2,000 ea) <br />Special Signal Pole Design <br />Parcel Sketches & Legal Descriptions <br />Parcel Sketches & Legal Descriptions @ $600 <br />(original est. at I 1 parcels) <br />Parcel Staking (10 @ $600.00) <br />Cure Plans <br />Pond/Property Site Surveys <br />Miscellaneous Wetland Delineation <br />Re -profiling Roadway due to Groundwater <br />Project Coordination/Meetings/Admin. <br />Construction Phase Assistance <br />Sub4total <br />Grand Totals <br />Fee Fee <br />Amendment S Total Contract <br />$ 0.00 $ 159000.00 <br />$ 0.00 $ 22,760.00 <br />$ 0.00 $ 529542.00 <br />$ 0.00 $ 1,020.00 <br />$ 0.00 $ 69000.00 <br />$ 0.00 $ 129000.00 <br />$ 0.00 $ 37,350.00 <br />349650.00��� <br />$ 0.00 $ 16,000.00 <br />$ 0.00 $ 169000.00 <br />$ 0.00 $ 799500.00 <br />$ 0.00 $ 69600.00 <br />$ 0.00 $ 8,640.00 <br />$ 0.00 $ 329000.00 <br />$ 0.00 $ 271000.00 <br />$ 0.00 $ 0.00 <br />$ 0.00 $ 69270.00 <br />$ 159000.00 $ 15,000.00 <br />$ 0.00 $ 209000.00 <br />$ 15,000.00 $ 420,332.00 <br />$194439551.00 <br />(1) This fee is provided for separately, as funding source is the responsibility of the COUNTY Utility Department. <br />When submitting invoices, this work effort will be indicated separately. <br />