B .
<br /> B . If ENGINEER considers it necessary or
<br /> SeWiGeS of an ndepeRdGRt testing lablarat(DFy to
<br /> perform all inSpeGtieRS , tests , er approvals required b advisable that covered Work be observed by ENGI -
<br /> NEER or inspected or tested by others , CONTRAC-
<br /> TOR, at ENGINEER' s request , shall uncover, expose ,
<br /> I for inspe(StiORS , tests , Gr approvals. or otherwise make available for observation , inspec-
<br /> . tion , or testing as ENGINEER may require , that
<br /> belew ; portion of the Work in question , furnishing all neces -
<br /> sary labor, material , and equipment . If it is found that
<br /> such Work is defective , CONTRACTOR shall pay all
<br /> Claims , costs , losses , and damages (including but not
<br /> limited to all fees and charges of engineers , architects ,
<br /> attorneys , and other professionals and all court or
<br /> arbitration or other dispute resolution costs ) arising out
<br /> of or relating to such uncovering , exposure , observa-
<br /> tion , inspection , and testing , and of satisfactory
<br /> replacement or reconstruction (including but not
<br /> C . If Laws or Regulations of any public body limited to all costs of repair or replacement of work
<br /> of
<br /> having jurisdiction require any Work (or part thereof) others ) ; and OWNER shall be entitled to an
<br /> specifically to be inspected , tested , or approved by an appropriate decrease in the Contract Price . If the
<br /> employee or other representative of such public body, parties are unable to agree as to the amount thereof,
<br /> CONTRACTOR shall assume full responsibility for OWNER may make a Claim therefor as provided in
<br /> arranging and obtaining such inspections , tests , or paragraph 10 .05 . If, however, such Work is not found
<br /> approvals , pay , all costs in connection therewith , and to be defective , CONTRACTOR shall be allowed an
<br /> furnish ENGINEER the required certificates of inspec- increase in the Contract Price or an extension of the
<br /> tion or approval . Contract Times (or Milestones ) , or both , directly
<br /> attributable to such uncovering , exposure ,
<br /> D . CONTRACTOR shall be responsible for observation , inspection , testing , replacement, and
<br /> arranging and obtaining and shall pay all costs in reconstruction . If the parties are unable to
<br /> agree as to
<br /> connection with any inspections , tests , or approvals the amount or extent thereof, CONTRACTOR may
<br /> required for OWNER's and ENGINEER' s acceptance make a Claim therefor as provided in paragraph
<br /> of materials or equipment to be incorporated in the 10 . 05 .
<br /> Work; or acceptance of materials , mix designs , or
<br /> equipment submitted for approval prior to 13 . 05 OWNER May Stop the Work
<br /> CONTRACTOR's purchase thereof for incorporation
<br /> in the Work . Such inspections , tests , or approvals
<br /> shall be performed by organizations acceptable to
<br /> OWNER and ENGINEER . Mater;a! G OF eqWiPMEIRt, or fails to pepferm the We * an
<br /> E . If any Work (or the work of others) that is to
<br /> be inspected , tested , or approved is covered by CON -
<br /> TRACTOR without written concurrence of ENGI -
<br /> NEER, it must, if requested by ENGINEER , be uncov-
<br /> ered for observation .
<br /> F . Uncovering Work as provided in paragraph
<br /> 13 . 03 . E shall be at CONTRACTOR's expense unless
<br /> CONTRACTOR has given ENGINEER timely notice any of them .
<br /> of CONTRACTOR' s intention to cover the same and
<br /> ENGINEER has not acted with reasonable prompt-
<br /> ness in response to such notice .
<br /> 13 . 04 Uncovering Work
<br /> A. If any Work is covered contrary to the written
<br /> request of ENGINEER, it must, if requested by ENGI -
<br /> NEER, be uncovered for ENGINEER's observation
<br /> and replaced at CONTRACTOR's expense .