My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-238
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 9:57:35 AM
Creation date
10/1/2015 1:24:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/05/2010
Control Number
2010-238
Agenda Item Number
8.O.
Entity Name
Melvin Bush
Subject
Contract and Specifications 8th St. Sidewalk Improvements
Area
U.S. 1 to 6th Ave.
Project Number
0744
Bid Number
2010028
Supplemental fields
SmeadsoftID
8952
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01340 - Submittal of Shop Drawings <br /> E . All submittals shall bear the stamp of approval and signature of <br /> CONTRACTOR as evidence that they have been reviewed by <br /> CONTRACTOR . Submittals without this stamp of approval will not be <br /> reviewed by the ENGINEER and will be returned to CONTRACTOR . <br /> F . Assign a number to each submittal starting with No . 1 and thence <br /> numbered consecutively . Identify resubmittals by the original submittal <br /> number followed by the suffix " A" for the first resubmittal , the suffix " B " for <br /> the second resubmittal , etc . <br /> G . Initially submit to ENGINEER a minimum of six ( 6 ) copies of all submittals <br /> that are on 11 - inch by 17 - inch or smaller sheets ( no less than 8 1 /2 - inch x <br /> 11 - inch ) , and one unfolded sepia and 2 prints made from that sepia for all <br /> submittals on sheets larger than 11 - inch by 17 - inch . <br /> H . After ENGINEER completes his review , Shop Drawings will be marked <br /> with one of the following notations : <br /> 1 . Approved <br /> 2 . Approved as Corrected <br /> 3 . Approved as Corrected - Resubmit <br /> 4 . Revise and Resubmit <br /> 5 . Not Approved <br /> I . If a submittal is acceptable , it will be marked "Approved " or "Approved as <br /> Corrected " . Three (3 ) prints or copies of the submittal will be returned to <br /> CONTRACTOR . <br /> J . Upon return of a submittal marked "Approved " or "Approved as <br /> Corrected " , CONTRACTOR may order , ship or fabricate the materials <br /> included on the submittal , provided it is in accordance with the corrections <br /> indicated . <br /> K . If a Shop Drawing marked "Approved as Corrected " has extensive <br /> corrections or corrections affecting other drawings or Work , ENGINEER <br /> may require that CONTRACTOR make the corrections indicated thereon <br /> and resubmit the Shop Drawings for record purposes . Such drawings will <br /> have the notation , "Approved as Corrected - Resubmit . " <br /> L . If a submittal is unacceptable , three ( 3 ) copies will be returned to <br /> CONTRACTOR with one of the following notations : <br /> 1 . " Revise and Resubmit" <br /> 2 . " Not Approved " <br /> 01340 - Submittal of Shop Drawings <br /> 01340-5 <br /> F:\Engineering\Capital Projects\0744 - 8th St Sidewalk\0744 CONTRACT DOCUMENTS\01340 - Submittal of Shop Drawings.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.