My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-238
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 9:57:35 AM
Creation date
10/1/2015 1:24:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/05/2010
Control Number
2010-238
Agenda Item Number
8.O.
Entity Name
Melvin Bush
Subject
Contract and Specifications 8th St. Sidewalk Improvements
Area
U.S. 1 to 6th Ave.
Project Number
0744
Bid Number
2010028
Supplemental fields
SmeadsoftID
8952
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01520 <br /> CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS <br /> B . TEMPORARY SANITARY FACILITIES <br /> 1 . Provide temporary toilet facilities separate from the job office . <br /> Maintain these during the entire period of construction under this <br /> Contract for the use of all construction personnel on the job . <br /> Provide enough chemical toilets to conveniently serve the needs of <br /> all personnel . Properly seclude toilet facilities from public <br /> observation . <br /> 2 . Chemical toilets and their maintenance shall meet the requirements <br /> of State and local health regulations and ordinances . Immediately <br /> correct any facilities or maintenance methods failing to meet these <br /> requirements . Upon completion of work , remove the facilities from <br /> the premises . <br /> 1A SECURITY <br /> Full time watchmen will not be specifically required as a part of the Contract , but <br /> the CONTRACTOR shall provide inspection of work area daily and shall take <br /> whatever measures are necessary to protect the safety of the public , workmen , <br /> and materials , and provide for the security of the site , both day and night . <br /> 1 . 5 TEMPORARY CONTROLS <br /> Take all necessary precautions to control dust and mud associated with the work <br /> of this Contract . In dry weather , spray dusty areas daily with water in order to <br /> control dust . Take necessary steps to prevent the tracking of mud onto adjacent <br /> streets and highways . <br /> 1 . 6 REMOVAL OF TEMPORARY CONSTRUCTION FACILITIES <br /> Remove the various temporary facilities , services , and controls and legally <br /> dispose of them as soon as the work is complete . The areas of the site used for <br /> temporary facilities shall be properly reconditioned and restored to a condition <br /> acceptable to the OWNER . <br /> + + END OF SECTION + + <br /> 01520-2 <br /> F:\Engineering\Capital Projects\0744 - 8th St Sidewalk from U . S . 1 to 6th Ave\0744 CONTRACT DOCUMENTS\01520 - Construction <br /> Facilities .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.