My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-238
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 9:57:35 AM
Creation date
10/1/2015 1:24:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/05/2010
Control Number
2010-238
Agenda Item Number
8.O.
Entity Name
Melvin Bush
Subject
Contract and Specifications 8th St. Sidewalk Improvements
Area
U.S. 1 to 6th Ave.
Project Number
0744
Bid Number
2010028
Supplemental fields
SmeadsoftID
8952
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01550 <br /> ACCESS ROADS , PARKING AREAS <br /> AND USE OF PUBLIC STREETS <br /> 1 . 1 GENERAL <br /> A . Provide all temporary construction roads , walks and parking areas required <br /> during construction and for use of emergency vehicles . Design and maintain <br /> temporary roads and parking areas so they are fully usable in all weather <br /> conditions . <br /> B . Prevent interference with traffic and the OWNER' s operations on existing roads . <br /> Indemnify and save harmless the OWNER from any expenses caused by <br /> CONTRACTOR' s operations over these roads . <br /> C . Roadways damaged by CONTRACTOR shall be restored to their original <br /> condition by the CONTRACTOR subject to approval of the OWNER or <br /> ENGINEER . <br /> D . Remove temporary roads , walks and parking areas prior to final acceptance and <br /> return the ground to its original condition , unless otherwise required by the <br /> Contract Documents . <br /> 1 . 2 USE OF PUBLIC STREETS <br /> The use of public streets and alleys shall be such as to provide a minimum of <br /> inconvenience to the public and to other traffic . Any earth or other excavated <br /> material spilled from trucks shall be removed immediately by the CONTRACTOR <br /> and the streets cleaned to the satisfaction of the Owner . <br /> 1 . 3 USE OF PUBLIC STREETS FOR HAUL ROADS <br /> A . Prior to construction , the CONTRACTOR shall designate all proposed haul <br /> roads to be used during the life of the project . Any earth or other materials <br /> spilled from trucks shall be removed by the CONTRACTOR and streets <br /> cleaned to the satisfaction of the Owner. He further shall be responsible for <br /> repairs to any damages caused by his operations , prior to final payment . <br /> 01550 Access Roads <br /> 01550- 1 <br /> R\Engineering\Capital Projects\0744 - 8th St Sidewalk\0744 CONTRACT DOCUMENTS\01550 - Access Roads .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.