My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-238
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 9:57:35 AM
Creation date
10/1/2015 1:24:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/05/2010
Control Number
2010-238
Agenda Item Number
8.O.
Entity Name
Melvin Bush
Subject
Contract and Specifications 8th St. Sidewalk Improvements
Area
U.S. 1 to 6th Ave.
Project Number
0744
Bid Number
2010028
Supplemental fields
SmeadsoftID
8952
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G . It is the intent of the Specifications to place the responsibility on the <br /> CONTRACTOR to restore to their original condition all items disturbed , <br /> destroyed , or damaged during construction . Particular attention will be <br /> placed on restoration of canals to equal or better condition than prior to <br /> construction . <br /> H . When finished surfaces require cleaning with cleaning materials , use only <br /> those cleaning materials which will not create hazards to health or <br /> property and which will not damage the surfaces . Use cleaning materials <br /> only on those surfaces recommended by the manufacturer. Follow the <br /> manufacturer' s directions and recommendations at all times . <br /> I . Keep the amount of dust produced during construction activities to a <br /> minimum . At CONTRACTOR' s expense , spray water or other dust control <br /> agents over the areas , which are producing the dust . Schedule <br /> construction operations so that dust and other contaminants will not fall on <br /> wet or newly coated surfaces . <br /> 1 . 3 SITE CLEANUP AND RESTORATION <br /> Prior to final completion , the OWNER , ENGINEER , INDIAN RIVER FARMS <br /> WATER CONTROL DISTRICT , and CONTRACTOR shall review the site with <br /> regards to site cleanup and restoration . Clean and /or restore all items <br /> determined to be unsatisfactory by the OWNER or ENGINEER , at no additional <br /> expense . <br /> + + END OF SECTION + + <br /> 01710 Site Cleanup <br /> 01710-2 <br /> F:\Engineering\Capital Projects\0744 - 8th St Sidewalk\0744 CONTRACT DOCUMENTS\01710 - Site Cleanup. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.