My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-238
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 9:57:35 AM
Creation date
10/1/2015 1:24:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/05/2010
Control Number
2010-238
Agenda Item Number
8.O.
Entity Name
Melvin Bush
Subject
Contract and Specifications 8th St. Sidewalk Improvements
Area
U.S. 1 to 6th Ave.
Project Number
0744
Bid Number
2010028
Supplemental fields
SmeadsoftID
8952
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION - 102 - MAINTENANCE OF TRAFFIC <br /> The work specified in this item shall conform to Section 102 of the Florida Department of <br /> Transportation Standard Specifications for Road and Bridge Construction (2010 Edition ) , <br /> except as modified herein . <br /> A . GENERAL PROVISIONS - DESCRIPTION : The work specified in this Section <br /> consists of maintaining traffic within the limits of the project for the duration of the <br /> construction period , including any temporary suspensions of the work . It shall <br /> include the construction and maintenance of any necessary detour facilities ; the <br /> providing of necessary facilities for access to residences , businesses , etc . , along <br /> the project ; the furnishing , installing and maintaining of traffic control and safety <br /> devices during construction , the control of dust through the use of calcium chloride if <br /> necessary , and any other special requirements for safe and expeditious movement <br /> of traffic as may be called for on the plans . The term , Maintenance of Traffic , as <br /> used herein , shall include all of such facilities , devices and operations as are <br /> required for the safety and convenience of the public as well as for minimizing public <br /> nuisance ; all as specified in this Itemized Section 14 of these provisions and <br /> Paragraph 24 in General Conditions Section . <br /> B . BEGINNING DATE OF CONTRACTOR ' S RESPONSIBILITY : The Contractor shall <br /> present his Maintenance of Traffic Plan at the pre - construction conference . The <br /> Maintenance of Traffic Plan shall indicate the type and location of all signs , lights , <br /> barricades , striping and barriers to be used for the safe passage of pedestrians and <br /> vehicular traffic through the project and for the protection of the workmen . The plan <br /> will indicate conditions and setups for each phase of the Contractor' s activities . <br /> When the project plans include or specify a specific Maintenance of Traffic Plan , <br /> alternate proposals will be considered when they are found to be equal to or better <br /> than the plan specified . <br /> In no case may the Contractor begin work until the Maintenance of Traffic Plan has <br /> been approved in writing by the Engineer . Modifications to the Maintenance of <br /> Traffic Plan that become necessary shall also be approved in writing . Except in an <br /> emergency , no changes to the approved plan will be allowed until approval to <br /> change such plan has been received . <br /> The cost of all work included in the Maintenance of Traffic Plan shall be included in <br /> the pay item for Maintenance of Traffic . <br /> The Contractor shall be responsible for performing daily inspections , including <br /> weekends and holidays , with some inspections at nighttime , of the installations on <br /> the project and replace all equipment and devices not conforming with the approved <br /> standards during that inspection . The project personnel will be advised of the <br /> schedule of these inspections and be given the opportunity to join in the inspection <br /> as is deemed necessary . <br /> 2 Technical Specifications <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0744-8th St-US1 to 6th Ave\Admim\bid documents\0744 CONTRACT <br /> DOCUMENTS\Technical Specifications .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.