My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-238
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 9:57:35 AM
Creation date
10/1/2015 1:24:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/05/2010
Control Number
2010-238
Agenda Item Number
8.O.
Entity Name
Melvin Bush
Subject
Contract and Specifications 8th St. Sidewalk Improvements
Area
U.S. 1 to 6th Ave.
Project Number
0744
Bid Number
2010028
Supplemental fields
SmeadsoftID
8952
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION — 104 - EROSION CONTROL AND TREATMENT OF DEWATERING <br /> WATER AND STORMWATER FROM THE CONSTRUCTION SITE <br /> PART 1 — GENERAL <br /> 1 . 1 SCOPE <br /> A . This Section covers erosion control and the treatment of dewatering water and <br /> stormwater runoff from the construction site and work area . The pollution control <br /> measures shall prevent turbid or otherwise polluted waters from being discharged from <br /> the construction site or work area , to undeveloped portions of the site or off- site . <br /> B . The OWNER considers pollution from dewatering water and stormwater runoff <br /> from a construction site or work area to be a very serious offense . The <br /> CONTRACTOR is solely responsible for preventing pollution caused by <br /> dewatering water and stormwater runoff from the construction site orwork area . <br /> C . The pollution control measures specified herein represent minimum standards to be <br /> adhered to by the CONTRACTOR throughout the Project' s construction . The OWNER <br /> reserves the right to require the CONTRACTOR to employ additional pollution control <br /> measures , when in the sole opinion of the OWNER , they are warranted . If site specific <br /> conditions require additional erosion and stormwater pollution control measures during <br /> any phase of construction or operation to prevent erosion or to control sediment or other <br /> pollution , beyond those specified in the Drawings or herein , implement additional best <br /> management practices as necessary , in accordance with Chapter 4 , " Best Management <br /> Practices for Erosion and Sedimentation Control " of the Florida Erosion and Sediment <br /> Control Inspector' s Manual , and other references as may be required by regulatory <br /> permits . <br /> D . The OWNER may terminate this Contract if the CONTRACTOR fails to comply with this <br /> Section . Alternatively , the OWNER may halt the CONTRACTOR' s operations until the <br /> CONTRACTOR is in full compliance with this Section . If the OWNER halts the <br /> CONTRACTOR ' s work as a result of its failure to comply with this Section , the <br /> Construction Contract time clock will continue to run . <br /> E . In addition to these Specifications , comply with Chapter - " Best Management Practices <br /> for Erosion and Sedimentation Control " and Chapter 5 — " Best Management Practices <br /> for Dewatering " of the Florida Erosion and Sediment Control Inspector' s Manual . In the <br /> event of a conflict between the referenced Chapters and these Specifications , the more <br /> stringent requirement shall prevail . <br /> 1 . 2 SOME PERMITS TO BE OBTAINED BY THE CONTRACTOR <br /> A . The OWNER has obtained certain permits for this project and they are listed in <br /> 4 Technical Specifications <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0744-8th St- US1 to 6th Ave\Admim\bid documents\0744 CONTRACT <br /> DOCUMENTS\Technical Sped fication s .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.