My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-238
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 9:57:35 AM
Creation date
10/1/2015 1:24:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/05/2010
Control Number
2010-238
Agenda Item Number
8.O.
Entity Name
Melvin Bush
Subject
Contract and Specifications 8th St. Sidewalk Improvements
Area
U.S. 1 to 6th Ave.
Project Number
0744
Bid Number
2010028
Supplemental fields
SmeadsoftID
8952
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G . Construction Site Egress Driveways : Minimize the transport of sediment and soil <br /> from the construction site or work area by vehicle wheels . Construct a crushed rock <br /> driving surface at the vehicle exit point ( s ) . Provide an area large enough to remove <br /> the sediment and soil from vehicle wheels before the vehicle leaves the construction <br /> site or work area . Provide wash -down stations as required to wash vehicle tires and <br /> retain all washwater on - site . Do not use limerock . <br /> H . Rock and Stone for Erosion Control and Pollution Control and Treatment : <br /> 1 . Crushed Limerock : Crushed limerock shall not be used under any <br /> circumstance . <br /> 2 . Acceptable Material : FDOT #4 non -calcareous aggregate ( usually granite ) , <br /> washed and meeting the requirements of FDOT Standard Specifications for <br /> Road and Bridge Construction , Section 901 . <br /> I . Hay Bales : Hay bales shall not be used . <br /> PART 3 - EXECUTION <br /> A . Design , construct , and maintain the pollution control and treatment system to <br /> minimize erosion and capture and remove pollutants from the construction site and <br /> from all other areas disturbed by construction activities . <br /> B . Apply polyacrylamide only as directed by the polyacrylamide manufacturer/supplier. <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No . 104 - 1 — Erosion and Water Pollution Control - Lump Sum <br /> Bid Item No . 104 - 10 - 3 — Sediment Barrier ( Staked Silt Fence ) — Per Linear Foot <br /> Bid Item No . 104 - 11 — Floating Turbidity Barrier — Per Linear Foot <br /> CONTRACTOR' s AFFIDAVIT REGARDING EROSION <br /> 10 Technical Specifications <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0744-8th St-US1 to 6th Ave\Admim\bid documents\0744 CONTRACT <br /> DOCUMENTS\Technical Specification s .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.