My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-238
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 9:57:35 AM
Creation date
10/1/2015 1:24:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/05/2010
Control Number
2010-238
Agenda Item Number
8.O.
Entity Name
Melvin Bush
Subject
Contract and Specifications 8th St. Sidewalk Improvements
Area
U.S. 1 to 6th Ave.
Project Number
0744
Bid Number
2010028
Supplemental fields
SmeadsoftID
8952
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
reached , and excavate to such additional <br /> dept <br /> ured , excavate Cn such maneliminate <br /> to al ow ghe <br /> er <br /> of undermining . Wherever rock bottom sse <br /> solid rock to be exposed and prepared <br /> thin strata . Haverizontal ds for he Engineer receiving the masonry , Remove <br /> inspect and approve all <br /> all loose and disintegratedrock <br /> foundation excavations prior to placing masonry . <br /> 120 -3 . 4 . 2 Earth Excavation : <br /> 120 -3 . 4 . 2 . 1 Foundation Material other than the Rock : When masonry <br /> is to rest on an excavated surface other than rock , take special care to avoid disturbing the <br /> bottom of the excavation , and do not remove the final foundation material to grade until just <br /> before placing the masonry . In case the foundation material is soft or mucky , the Engineer <br /> may require excavation to a greater depth and to backfill to grade with approved material . <br /> 120 -3 . 4 . 2 . 2 Foundation Piles : Where foundation piles are used , <br /> complete the excavation of each pit before driving the piles . After the driving is completed , <br /> remove all loose and displaced material , leaving a smooth , solid , and level bed to receive the <br /> masonry . <br /> 120 -3 . 4 . 2 . 3 Removal of Obstructions : Remove boulders , logs , or any <br /> unforeseen obstacles encountered in excavating . <br /> 120 -3 . 4 . 3 Rock Excavation : Clean all rock and other hard foundation material , <br /> remove all loose material , and cut all rock to a firm surface . Either level , step vertically and <br /> horizontally , or serrate the rock , as may be directed by the Engineer . Clean out all seams , and <br /> fill them with concrete or mortar . <br /> 120 -3 . 4 . 4 Pipe Trench Excavation : Excavate trenches for pipe culverts and <br /> storm sewers to the elevation of the bottom of the pipe and to a width sufficient to provide <br /> adequate working room . Remove soil not meeting the classification specified as suitable <br /> backfill material in 120 -8 . 3 . 2 . 2 to a depth of 4 inches below the bottom of the pipe elevation . <br /> Remove rock , boulders or other hard lumpy or unyielding material to a depth of 12 inches <br /> below the bottom of the pipe elevation . Remove muck or other soft material to a depth <br /> necessary to establish a firm foundation . Where the soils permit , ensure that the trench sides <br /> are vertical up to at least the mid - point of the pipe . <br /> For pipe lines placed above the natural ground line , place and compact <br /> the embankment , prior to excavation of the trench , to an elevation at least 2 feet above the <br /> top of the pipe and to a width equal to four pipe diameters , and then excavate the trench to <br /> the required grade . <br /> 120-4 Disposal of Surplus and Unsuitable Material. <br /> 1204 . 1 Ownership of Excavated Materials : Dispose of surplus and excavated <br /> materials as shown in the plans or , if the plans do not indicate the method of disposal , take <br /> ownership of the materials and dispose of them outside the right- of-way . <br /> 1204 . 2 Disposal of Muck on Side Slopes : As an exception to the provisions of <br /> 120 -4 . 1 , when approved by the Engineer , muck (A- 8 material ) may be placed on the slopes , <br /> or stored alongside the roadway , provided there is a clear distance of at least 6 feet between <br /> the roadway grading limits and the muck , and the muck is dressed to present a neat <br /> appearance . In addition , this material may also be disposed of by placing it on the slopes <br /> where , in the opinion of the Engineer , this will result in an aesthetically pleasing appearance <br /> and will have no detrimental effect on the adjacent developments . Where the Engineer <br /> permits the disposal of muck or other unsuitable material inside the right-of-way limits , do not <br /> place such material in a manner which will impede the inflow or outfall of any channel or of <br /> 22 Technical Specifications <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0744-8th St-USI to 6th Ave\Admim\bid documents\0744 CONTRACT <br /> DOCUMENTS\Technical Specifications .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.