My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-238
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 9:57:35 AM
Creation date
10/1/2015 1:24:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/05/2010
Control Number
2010-238
Agenda Item Number
8.O.
Entity Name
Melvin Bush
Subject
Contract and Specifications 8th St. Sidewalk Improvements
Area
U.S. 1 to 6th Ave.
Project Number
0744
Bid Number
2010028
Supplemental fields
SmeadsoftID
8952
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
344 -3 . 6 . 2 Concreting in Hot Weather : Meet the temperature requirements and <br /> special measures for mixing and placing concrete in hot weather as specified in Section 346 . <br /> When the temperature of the concrete as placed exceeds 75 ° F , <br /> incorporate in the concrete mix a water- reducing retarder or water reducer if allowed by <br /> Section 346 . <br /> Spray reinforcing steel and metal forms with cool fresh water just prior to <br /> placing the concrete in a method approved by the Engineer . <br /> Assume ail risks connected with the placing and curing of concrete . <br /> Although the Engineer may give permission to place concrete , the Contractor is responsible <br /> for satisfactory results . If the placed concrete is determined to be unsatisfactory , remove , <br /> dispose of, and replace the concrete at no expense to the Agency . <br /> 344 -3 . 7 Mixers : Ensure that mixers are capable of combining the components of <br /> concrete into thoroughly mixed and uniform mass , free from balls or lumps of cementitious <br /> materials , and capable of discharging the concrete uniformly . Operate concrete mixers at <br /> speeds per the manufacturer' s design . Do not exceed the manufacturer' s rated capacity for <br /> the volume of mixed concrete in the mixer , mixing drum , or container . <br /> 344 -3 . 8 Small Quantities of Concrete : With approval of the Engineer, small quantities <br /> of concrete , less than 3 yd 3 placed in one day and less than 0 . 5 yd placed in a single <br /> placement may be accepted using a pre - bagged mixture . The Agency may verify that the pre - <br /> bagged mixture is prepared in accordance with the manufacturer' s recommendations and will <br /> meet the requirements of this Specification . <br /> 344 -3 . 9 Sampling and Testing : <br /> 344 -3 . 9 . 1 Category 1 : The Engineer may sample and test the concrete at his <br /> discretion to verify its quality . The minimum 28 day compressive strength requirement forthis <br /> concrete is 2 , 500 psi . <br /> 344 -3 . 9 . 2 : Category 2 : Provide a statement of certification from the <br /> manufacturer of the precast element that the element meets the quality control and inspection <br /> testing requirements of the Contract Documents . <br /> 344-3 . 9 . 3 Category 3 : The Agency will randomly select a sample from each 200 <br /> yd or one day' s production to determine plastic properties and to make three 4 x 8 inch <br /> cylinders for testing by the Agency at 28 days to ensure that the design compressive strength <br /> has been met . The Agency may , at its discretion , test additional concrete samples to ensure <br /> compliance with the specifications . <br /> 344 -3 . 10 Records : Maintain the following records for review for at least 3 years after <br /> final acceptance of the project : <br /> 1 . Approved concrete mix designs . <br /> 2 . Materials source (delivery tickets , certifications , certified mill test reports ) . <br /> 3 . A copy of the scale company or testing agency report showing the observed <br /> deviations from quantities checked during calibration of the scales and meters . <br /> 4 . A copy of the documentation certifying the admixture weighing / measuring <br /> devices . <br /> 5 . For Non Structural LAP concrete the Agency will accept recent NRMCA , <br /> VMMB or FDOT inspection records certifying the plant or truck can produce concrete . In <br /> addition , documentation will be available at the plant or in the truck showing that action has <br /> been taken to correct deficiencies noted during the inspections . <br /> 43 Technical Specifications <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0744-8th St-US1 to 6th Ave\Admim\bid documents\0744 CONTRACT <br /> DOCUMENTS\Technical Specifications .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.