Laserfiche WebLink
SECTION - 520 - CONCRETE CURB AND GUTTER <br /> The work specified in this item shall conform to Section 520 of the Florida <br /> Department of Transportation Standard Specifications for Road and Bridge <br /> Construction ( 2010 ) . <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under : <br /> Bid Item No . 520 - 1 - 10 — Concrete Curb and Gutter (Type " F " ) — Per Linear foot <br /> SECTION - 522 — CONCRETE SIDEWALK <br /> The work specified in this item shall conform to Section 522 of the Florida <br /> Department of Transportation Standard Specifications for Road and Bridge <br /> Construction (2010 ) . <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under : <br /> Bid Item No . 522 - 1 — Concrete Sidewalk ( 6 " Thick) — Per Square Yard <br /> SECTION — 570 — PERFORMANCE TURF <br /> A . Description : Sod for the project shall be of the variety that is common to the area <br /> and of a variety approved by the Engineer . This work shall also include mowing in <br /> accordance with Section 104 - 7 . 2 , to be mowed at 6 " height with a mulching mower . <br /> B . Work Included : Scope of Work : The work specified in this section consists of the <br /> establishing of a stand of grass , within the project , right-of-way , easements , and other <br /> areas indicated on the Drawings , by furnishing and placing grass sod . Also included <br /> are fertilizing , watering and maintenance as required to assure a healthy stand of <br /> grass . Two applications of fertilizer will be required with the initial application being <br /> fertilizer and the second application being "weed and feed " . <br /> C . Guarantee : All sodded areas shall be guaranteed for three months after date of final <br /> acceptance . <br /> Replacement of Defective Sod : Any dead sod or sod showing ( less than 95 % of a <br /> square ) indication of probable non survival or lack of health and vigor , or which do not <br /> exhibit the characteristics to meet specifications , shall be replaced within two weeks of <br /> notice from Owner or Engineer . All replacement sod shall be furnished / installed at no <br /> additional cost to the Owner and shall be guaranteed forthree months . All replacement <br /> shall meet original specifications . <br /> The Contractor shall notify the Owner and Engineer ten days prior to the end of the <br /> guarantee period and such guarantee shall be extended until notification is received . <br /> At the end of the guarantee period , all sod that is dead or in unsatisfactory growth shall <br /> be replaced within two weeks . <br /> D . Fertilizer : Commercial fertilizers shall comply with the state fertilizer laws . <br /> 45 Technical Specifications <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0744-8th St-US1 to 6th Ave\Admim\bid documents\0744 CONTRACT <br /> DOCUMENTS\Technical Specifications . doc <br />