Laserfiche WebLink
580 -3 . 4 Collected Plants ( Herbaceous ) ( HC ) : The root mass and vegetative portions <br /> of collected herbaceous plants shall be as large as the specified container-grown equivalent . <br /> Do not plant any collected plant before inspection and acceptance by the Engineer . <br /> 580 -3 . 5 Specimen Plants ( Special Grade) : When Specimen (or Special Grade ) <br /> plants are required , label them as such on the plant list , and tag the plant to be furnished . <br /> 580 -3 . 6 Palms : Wrap the roots of all plants of the palm species before transporting , <br /> except if they are CG plants and ensure that they have an adequate root ball structure and <br /> mass for healthy transplantation as defined in " Florida Grades and Standards for Nursery <br /> Plants " . <br /> The Engineer will not require burlapping if the palm is carefully dug from marl or <br /> heavy soil that adheres to the roots and retains its shape without crumbling . During <br /> transporting and after arrival , carefully protect root balls of palms from wind and exposure to <br /> the sun . Muck grown palms are not allowed . After delivery to the job site , if not planting the <br /> palm within 24 hours , coverthe root ball with a moist material . Plant all palms within 48 hours <br /> of delivery to the site . <br /> Move sabal and coconut palms in accordance with the " Florida Grades and <br /> Standards for Nursery Plants . " <br /> 580 -3 . 7 Substitution of Container-Grown ( CG ) Plants : With the Engineer' s approval , <br /> the Contractor may substitute CG plants for any other root classification types , if he has met <br /> all other requirements of the Contract Documents . <br /> 580-4 Planting Requirements . <br /> 580 -4 . 1 Layout : Prior to any excavation or planting , mark all planting beds and <br /> individual locations of palms , trees , large shrubs and proposed art and architectural <br /> structures , as shown in the plans , on the ground with a common bright orange colored spray <br /> paint , or with other approved methods , within the project limits . Obtain the Engineer' s <br /> approval and make necessary utility clearance requests . <br /> 5804 . 2 Excavation of Plant Holes : Excavate plant holes after an area around the <br /> plant three times the size of the root ball has been tilled to a depth of the root ball . Ensure that <br /> the plant hole is made in the center of the tilled area only to the depth of the plant root ball . <br /> Where excess material has been excavated from the plant hole , use the <br /> excavated material to backfill to proper level . <br /> 580 -4 . 3 Setting of Plants : Center plants in the hole . Lower the plant into the hole so <br /> that it rests on a prepared hole bottom such that the roots are level with , or slightly above , the <br /> level of their previous growth and so oriented such as to present the best appearance . <br /> Backfill with native soil , unless otherwise specified on the plans . Firmly rod and <br /> water- in the backfill so that no air pockets remain . Apply a sufficient quantity of water <br /> immediately upon planting to thoroughly moisten all of the backfilled earth . Keep plants in a <br /> moistened condition for the duration of the planting period . <br /> When so directed , form a water ring 6 inches [ 150 mm] in width to make a water <br /> collecting basin with an inside diameter equal to the diameter of the excavated hole . Maintain <br /> the water ring in an acceptable condition . <br /> 580 -4 . 4 Special Bed Preparation : Where multiple or mass plantings are to be made <br /> in extended bedding areas , and the plans specify Special Bed Preparation , prepare the <br /> planting beds as follows : <br /> Remove all vegetation from within the area of the planting bed and excavate the <br /> surface soil to a depth of 6 inches [ 150 mm] . Backfill the excavated area with peat , sand , <br /> finish soil layer material or other material to the elevation of the original surface . Till the entire <br /> 49 Technical Specifications <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0744-8th St-USI to 6th Ave\Admim\bid documents\0744 CONTRACT <br /> DOCUMENTS\Technical Specifications .doc <br />