My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-238
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 9:57:35 AM
Creation date
10/1/2015 1:24:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/05/2010
Control Number
2010-238
Agenda Item Number
8.O.
Entity Name
Melvin Bush
Subject
Contract and Specifications 8th St. Sidewalk Improvements
Area
U.S. 1 to 6th Ave.
Project Number
0744
Bid Number
2010028
Supplemental fields
SmeadsoftID
8952
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL CONDITIONS AND TERMS <br /> Section Caption <br /> GC 1 Definitions <br /> GC 2 Execution , Correlation and Intent <br /> GC 3 Contractor Liable and Responsible to Owner <br /> GC 4 Engineer' s Status <br /> GC 5 Design , Drawings and Specifications <br /> GC 6 Materials , Labor, Equipment <br /> GC 7 Permit and Fees <br /> GC 8 Project Manager <br /> GC 9 Subcontractors and Suppliers <br /> GC 10 Contractor Meetings <br /> GC 11 Scheduling <br /> GC 12 Schedule of Values <br /> GC 13 Land for Work <br /> GC 14 Survey , Lines and Grade <br /> GC 15 Site Conditions <br /> GC 16 Subsoil Conditions <br /> GC 17 Surface and Subsurface Water <br /> GC 18 Contractor Work Area <br /> GC 19 Contractor- Furnished Materials , Equipment and Workmanship <br /> GC 20 Protection of the Work and Property <br /> GC 21 Utilities <br /> GC 22 Delivery Unloading and Storage <br /> GC 23 Fire Protection <br /> GC 24 Illumination <br /> GC 25 Dust Control <br /> GC 26 Pollution Control <br /> GC 27 Explosives and Hazardous Materials <br /> GC 28 Labor <br /> GC 29 Safety <br /> GC 30 Progress <br /> GC 31 Inspection <br /> GC 32 Testing <br /> GC 33 Substitution <br /> GC 34 Correction of Defective Materials or Workmanship <br /> GC 35 Correction of Work <br /> GC 36 Owner' s Right to Correct or Complete Work <br /> GC 37 Changes in Work <br /> GC 38 Use of Completed Portions <br /> GC 39 Cleaning Up <br /> 28 <br /> 1211 /2009 3:45:46 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.