My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-238
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 9:57:35 AM
Creation date
10/1/2015 1:24:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/05/2010
Control Number
2010-238
Agenda Item Number
8.O.
Entity Name
Melvin Bush
Subject
Contract and Specifications 8th St. Sidewalk Improvements
Area
U.S. 1 to 6th Ave.
Project Number
0744
Bid Number
2010028
Supplemental fields
SmeadsoftID
8952
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FHWA- 1273 Electronic version -- March 10 , 1994 <br /> REQUIRED CONTRACT PROVISIONS <br /> FEDERAL-AID CONSTRUCTION CONTRACTS <br /> (REV 340-94) (7-00) <br /> I . General <br /> II . Nondiscrimination <br /> III. Nonsegregated Facilities <br /> IV . Payment of Predetermined Minimum Wage <br /> V . Statements and Payrolls <br /> VI . Record of Materials , Supplies , and Labor <br /> VII . Subletting or Assigning the Contract <br /> VIII. Safety : Accident Prevention <br /> IX . False Statements Concerning Highway Projects <br /> X . Implementation of Clean Air Act and Federal Water Pollution Control Act <br /> XI . Certification Regarding Debarment, Suspension, Ineligibility, and Voluntary Exclusion <br /> XII . Certification Regarding Use of Contract Funds for Lobbying <br /> ATTACHMENTS <br /> A . Employment Preference for Appalachian Contracts (included in Appalachian contracts only) <br /> I. GENERAL <br /> 1 . These Contract provisions shall apply to all work performed on the Contract by the <br /> Contractor ' s own organization and with the assistance of workers under the Contractor ' s <br /> immediate superintendence and to all work performed on the Contract by piecework, station <br /> work, or by subcontract . <br /> 2 . Except as otherwise provided for in each section , the Contractor shall insert in each subcontract <br /> all of the stipulations contained in these Required Contract Provisions , and fiirther require their inclusion <br /> in any lower tier subcontract or purchase order that may in turn be made . The Required Contract <br /> Provisions shall not be incorporated by reference in any case . The Prime Contractor shall be responsible <br /> for compliance by any subcontractor or lower tier subcontractor with these Required Contract Provisions . <br /> 3 . A breach of any of the stipulations contained in these Required Contract Provisions shall be <br /> sufficient grounds for termination of the Contract . <br /> 4 . A breach of the following clauses of the Required Contract Provisions may also be grounds for <br /> debarment as provided in 29 CFR 5 . 12 : <br /> Section I, paragraph 2 ; <br /> Section IV, paragraphs 1 , 2 , 3 , 4 , and 7 ; <br /> Section V , paragraphs 1 and 2a through 2g . <br /> 5 . Disputes arising out of the labor standards provisions of Section IV (except paragraph 5 ) and <br /> Section V of these Required Contract Provisions shall not be subject to the general disputes clause of this <br /> Contract. Such disputes shall be resolved in accordance with the procedures of the U . S . Department of <br /> Labor (DOL) as set forth in 29 CFR 5 , 6 , and 7 . Disputes within the meaning of this clause include <br />
The URL can be used to link to this page
Your browser does not support the video tag.