My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-282
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-282
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2016 10:24:32 AM
Creation date
10/1/2015 2:34:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
11/02/2010
Control Number
2010-282
Agenda Item Number
12.J.2
Entity Name
Timothy Rose Contracting
Subject
Change Order No.2 NWTP Raw Water Transmission System
Area
North Water Treatment Plant
Project Number
UCP2422
Supplemental fields
SmeadsoftID
9872
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIKTHY ROSE CONTRACTING, INC. <br /> 1360 Old Dixie Highway SW Suite 106 <br /> Vero Beach, Florida 32962 <br /> ( 772) 564 7800 <br /> ( 772 ) 564 7888 <br /> Timrose7 bellsouth . net <br /> September 22, 2010 <br /> Indian River County Utilities <br /> 180027 th Street <br /> Vero Beach, FI 32960 <br /> RE : N WTP Raw Water Transmission System <br /> "REVISED" REQUESTED CHANGE ORDER <br /> Change Order Proposal For Miscellaneous Contract Changes : <br /> Six - 10" x 8" SS Flange Reducers ( Labor $ 2,400 .00; Materials $ 90048 . 00) Add : $ 12, 848. 00 <br /> W Stainless Steel to Six Well Heads ( Labor = $ 2, 188 . 10 ; Materials = $ 10210 .90 ) Add : $ 3, 399 .00 <br /> 690 LF — 6" FPL Pump # 7 — Labor & Equipment Add : $ 51600.00 <br /> Additional Conduit & Pull Boxes Labor = $ 2,939 . 00; Material = $ 51307 .00) Add : $ 81246 .00 <br /> Additional Pull Boxes and Wire @ Site Lights ( Labor = $ 566 .00; Material $ 443 . 00) Add : $ 1, 009.00 <br /> FPL Directional Bore — Labor Only Add : $ 4, 000.00 <br /> 80 LF - 16" Directional Bore ( Labor = $ 15, 601.00; Material = $ 8, 104.00) Add : $ 231705 .00 <br /> 160 LF - 24" Directional Bore ( Labor = $ 52, 807. 00; Material = $ 21, 353 .00) Add : $ 741160 .00 <br /> One ( 1) — 20" Gate Valve Add : $ 91355 . 00 <br /> One ( 1 ) — 16" 90" Bend Add : $ 41439 .00 <br /> DEDUCT Five Power Pull Boxes ; Seven Fiber Boxes Deduct: <$ 71869 .00> <br /> DEDUCTSecondary's From FPL to Well # 7 Deduct: <$ 60952.00> <br /> DEDUCT Credit Change Pumps Deduct : <$ 53, 616 .36> <br /> DEDUCT: 960 LF - 16" PVC @ $ 38 .05 Deduct : <$ 36, 52&00> <br /> DEDUCT: 80 LF - 20" PVC @ $ 57 . 65 Deduct : <$ 40612.00> <br /> DEDUCT: One ( 1) — 16" 450 Bend Deduct: <$ 31157 . 00> <br /> Additional Bond Fee Add : $ 340. 27 <br /> Total Requested Change in Contract Add : $ 34,366. 91 <br /> If you have any questions, do not hesitate to contact our office. <br /> Thank you — <br /> Vickie Wright <br />
The URL can be used to link to this page
Your browser does not support the video tag.