Laserfiche WebLink
TIKTHY ROSE CONTRACTING, INC. <br /> 1360 Old Dixie Highway SW Suite 106 <br /> Vero Beach, Florida 32962 <br /> ( 772) 564 7800 <br /> ( 772 ) 564 7888 <br /> Timrose7 bellsouth . net <br /> September 22, 2010 <br /> Indian River County Utilities <br /> 180027 th Street <br /> Vero Beach, FI 32960 <br /> RE : N WTP Raw Water Transmission System <br /> "REVISED" REQUESTED CHANGE ORDER <br /> Change Order Proposal For Miscellaneous Contract Changes : <br /> Six - 10" x 8" SS Flange Reducers ( Labor $ 2,400 .00; Materials $ 90048 . 00) Add : $ 12, 848. 00 <br /> W Stainless Steel to Six Well Heads ( Labor = $ 2, 188 . 10 ; Materials = $ 10210 .90 ) Add : $ 3, 399 .00 <br /> 690 LF — 6" FPL Pump # 7 — Labor & Equipment Add : $ 51600.00 <br /> Additional Conduit & Pull Boxes Labor = $ 2,939 . 00; Material = $ 51307 .00) Add : $ 81246 .00 <br /> Additional Pull Boxes and Wire @ Site Lights ( Labor = $ 566 .00; Material $ 443 . 00) Add : $ 1, 009.00 <br /> FPL Directional Bore — Labor Only Add : $ 4, 000.00 <br /> 80 LF - 16" Directional Bore ( Labor = $ 15, 601.00; Material = $ 8, 104.00) Add : $ 231705 .00 <br /> 160 LF - 24" Directional Bore ( Labor = $ 52, 807. 00; Material = $ 21, 353 .00) Add : $ 741160 .00 <br /> One ( 1) — 20" Gate Valve Add : $ 91355 . 00 <br /> One ( 1 ) — 16" 90" Bend Add : $ 41439 .00 <br /> DEDUCT Five Power Pull Boxes ; Seven Fiber Boxes Deduct: <$ 71869 .00> <br /> DEDUCTSecondary's From FPL to Well # 7 Deduct: <$ 60952.00> <br /> DEDUCT Credit Change Pumps Deduct : <$ 53, 616 .36> <br /> DEDUCT: 960 LF - 16" PVC @ $ 38 .05 Deduct : <$ 36, 52&00> <br /> DEDUCT: 80 LF - 20" PVC @ $ 57 . 65 Deduct : <$ 40612.00> <br /> DEDUCT: One ( 1) — 16" 450 Bend Deduct: <$ 31157 . 00> <br /> Additional Bond Fee Add : $ 340. 27 <br /> Total Requested Change in Contract Add : $ 34,366. 91 <br /> If you have any questions, do not hesitate to contact our office. <br /> Thank you — <br /> Vickie Wright <br />