2 . 05 Before Starting Construction 2 . 06 Preconstruction Conference <br /> A. CONTRACTOR 's Review of Contract DocuA, Within 20 days after the Cpntmpt I- <br /> ments: Before undertaking each part of the Work , to run , but before any Work at the Site <br /> i =rted <br /> CONTRACTOR shall carefully study and compare the conference attended by CONTRACT ENGINEER , <br /> Contract Documents and check and verify pertinent and others as appropriate wil held to establish a <br /> deFstandiR ;a Ann the paFties as to the <br /> figures therein and all applicable field measurements . <br /> CONTRACTOR shall promptly report in writing to Work and to disc a schedules referred to in para- <br /> ENGINEER any conflict, error, ambiguity, or graph 2 . 05 , rocedures for handling Shop Drawings <br /> discrepancy which CONTRACTOR may discover and and er submittals, processing Applications for <br /> shall obtain a written interpretation or clarification from fen <br /> ENGINEER before proceeding with any Work affected <br /> thereby; however, CONTRACTOR shall not be liable 2007 Initial Acceptance of Schedules <br /> to OWNER or ENGINEER for failure to report any <br /> conflict, error, ambiguity , or discrepancy in the A. Unless otherwise provided in the Contract <br /> Contract Documents unless CONTRACTOR knew or Documents , at least ten days before submission of the <br /> reasonably should have known thereof. first Application for Payment a conference attended by <br /> CONTRACTOR , ENGINEER , and others as appropri- <br /> B . Preliminary Schedules: Within ten days after ate will be held to review for acceptability to ENGI - <br /> the Effective Date of the Agreement ( unless otherwise NEER as provided below the schedules submitted in <br /> specified in the General Requirements) , CONTRAC- accordance with paragraph 2 . 05 . B . CONTRACTOR <br /> TOR shall submit to ENGINEER for its timely review: shall have an additional ten days to make corrections <br /> and adjustments and to complete and resubmit the <br /> 1 . a preliminary progress schedule schedules . No progress payment shall be made to <br /> indicating the times (numbers of days or dates) CONTRACTOR until acceptable schedules are <br /> for starting and completing the various stages submitted to ENGINEER , <br /> of the Work, including any Milestones specified <br /> in the Contract Documents ; 1 . The progress schedule will be <br /> acceptable to ENGINEER if it provides an <br /> 2 , a preliminary schedule of Shop orderly progression of the Work to completion <br /> Drawing and Sample submittals which will list within any specified Milestones and the <br /> each required submittal and the times for sub- Contract Times . Such acceptance will not <br /> mitting , reviewing , and processing such impose on ENGINEER responsibility for the <br /> submittal ; and progress schedule, for sequencing , scheduling , <br /> or progress of the Work nor interfere with or <br /> 30 a preliminary schedule of values for relieve CONTRACTOR from CONTRACTOR' s <br /> all of the Work which includes quantities and full responsibility therefor, <br /> prices of items which when added together <br /> equal the Contract Price and subdivides the 2 . CONTRACTOR's schedule of Shop <br /> Work into component parts in sufficient detail to Drawing and Sample submittals will be <br /> serve as the basis for progress payments acceptable to ENGINEER if it provides a <br /> during performance of the Work. Such prices workable arrangement for reviewing and <br /> will include an appropriate amount of overhead processing the required submittals . <br /> and profit applicable to each item of Work . <br /> 3 . CONTRACTOR' s schedule of values <br /> will be acceptable to ENGINEER as to form <br /> the Site is started , CONTRACTOR and OWNE all and substance if it provides a reasonable <br /> each deliver to the other, with copi o each allocation of the Contract Price to component <br /> additional insured identified in t upplementary parts of the Work . <br /> Conditions , certificates of urance (and other <br /> evidence of insuranc ich either of them or any <br /> additional insur may reasonably request) which <br /> CONTRA and OWNER respectively are <br /> AA <br /> 00700 - General Conditions REV 5- 10-13 doc <br /> 00700 - 9 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\ 1 341 -Historic Dodgertown (fka VS Sports Village) Room Renovations)V\dmin\bid documents\Master Contract Docs\Master <br /> Contract <br /> Documents\00700 - General Conditions REV 5-10- 13. doc <br />