Laserfiche WebLink
data furnished to OWNER or ENGINEER by the be made in the Contract Price or Contract <br /> owners of such Underground Facilities , including Times , or both , to the extent that they are <br /> OWNER , or by others . Unless it is otherwise attributable to the existence or location of any <br /> expressly provided in the Supplementary Conditions: Underground Facility that was not shown or <br /> indicated or not shown or indicated with <br /> 1 . OWNER and ENGINEER shall not reasonable accuracy in the Contract <br /> be responsible for the accuracy or com- Documents and that CONTRACTOR did not <br /> pleteness of any such information or data ; and know of and could not reasonably have been <br /> expected to be aware of or to have anticipated . <br /> 2 , the cost of all of the following will be If OWNER and CONTRACTOR are unable to <br /> included in the Contract Price , and CONTRAC- agree on entitlement to or on the amount or <br /> TOR shall have full responsibility for: extent, if any , of any such adjustment in <br /> Contract Price or Contract Times , OWNER or <br /> a . reviewing and checking all such CONTRACTOR may make a Claim therefor as <br /> information and data , provided in paragraph 10 . 05 . <br /> b . locating all Underground Facilities 4 . 05 Reference Points <br /> shown or indicated in the Contract <br /> Documents , A. OWNER shall provide engineering surveys to <br /> establish reference points for construction which in <br /> c . coordination of the Work with the ENGINEER' s judgment are necessary to enable <br /> owners of such Underground Facilities , CONTRACTOR to proceed with the Work . CON - <br /> including OWNER , during construction , and TRACTOR shall be responsible for laying out the <br /> Work, shall protect and preserve the established <br /> d , the safety and protection of all such reference points and property monuments , and shall <br /> Underground Facilities and repairing any make no changes or relocations without the prior <br /> damage thereto resulting from the Work. written approval of OWNER . CONTRACTOR shall <br /> report to ENGINEER whenever any reference point or <br /> B . Not Shown or Indicated property monument is lost or destroyed or requires <br /> relocation because of necessary changes in grades or <br /> 1 . If an Underground Facility is locations , and shall be responsible for the accurate <br /> uncovered or revealed at or contiguous to the replacement or relocation of such reference points or <br /> Site which was not shown or indicated , or not property monuments by professionally qualified <br /> shown or indicated with reasonable accuracy in personnel . <br /> the Contract Documents , CONTRACTOR shall , <br /> promptly after becoming aware thereof and 4 . 06 Hazardous Environmental Condition at Site <br /> before further disturbing conditions affected <br /> thereby or performing any Work in connection A. Reports and Drawings: Reference is made to <br /> therewith (except in an emergency as required the Supplementary Conditions for the identification of <br /> by paragraph 6 . 16 . A) , identify the owner of those reports and drawings relating to a Hazardous <br /> such Underground Facility and give written Environmental Condition identified at the Site, if any , <br /> notice to that owner and to OWNER and ENGI - that have been utilized by the ENGINEER in the <br /> NEER . ENGINEER will promptly review the preparation of the Contract Documents . <br /> Underground Facility and determine the extent, <br /> if any, to which a change is required in the B . Limited Reliance by CONTRACTOR on <br /> Contract Documents to reflect and document Technical Data Authorized: CONTRACTOR may rely <br /> the consequences of the existence or location upon the general accuracy of the "technical data" <br /> of the Underground Facility. During such time , contained in such reports and drawings , but such <br /> CONTRACTOR shall be responsible for the reports and drawings are not Contract Documents , <br /> safety and protection of such Underground Such "technical data" is identified in the <br /> Facility . Supplementary Conditions . Except for such reliance <br /> on such "technical data , " CONTRACTOR may not rely <br /> 2 . If ENGINEER concludes that a upon or make any Claim against OWNER , <br /> change in the Contract Documents is required , ENGINEER or any of ENGINEER' s Consultants with <br /> a Work Change Directive or a Change Order respect to : <br /> will be issued to reflect and document such <br /> consequences . An equitable adjustment shall <br /> 00700 - General Conditions REV 5-10-13. doc <br /> 00700 - 13 <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\1341 -Historic Dodgertown (fka VB Sports Village) Room Renovations)Mmin\bid documents\Master Contract Docs\Master <br /> Contract <br /> Documents\00700 - General Conditions REV 5-10- 13. doc <br />