My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-211A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-211A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2015 2:00:04 PM
Creation date
10/1/2015 5:47:02 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/22/2013
Control Number
2013-211A
Agenda Item Number
8.M.
Entity Name
OAC Action Construction
Subject
Contract Documents and Specifications
Historic Dodgertown Room Renovations
Project Number
1341
Bid Number
2014003
Alternate Name
Vero Beach Sports Village
Supplemental fields
SmeadsoftID
12688
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
employees , agents , and other consultants and comparable provisions for the benefit of <br /> subcontractors of each and any of them arising out of: CONTRACTOR in said direct contracts between <br /> OWNER and such utility owners and other <br /> 1 . the preparation or approval of, or the contractors , <br /> failure to prepare or approve , maps , Drawings , <br /> opinions , reports , surveys , Change Orders , C . If the proper execution or results of any part of <br /> designs , or Specifications ; or CONTRACTOR ' s Work depends upon work per- <br /> formed by others under this Article 7 , CONTRACTOR <br /> 2 , giving directions or instructions , or shall inspect such other work and promptly report to <br /> failing to give them , if that is the primary cause ENGINEER in writing any delays , defects , or deficien- <br /> of the injury or damage . cies in such other work that render it unavailable or <br /> unsuitable for the proper execution and results of <br /> CONTRACTOR 's Work . CONTRACTOR ' s failure to <br /> ARTICLE 7 - OTHER WORK so report will constitute an acceptance of such other <br /> work as fit and proper for integration with <br /> CONTRACTOR ' s Work except for latent defects and <br /> 7 . 01 Related Work at Site deficiencies in such other work . <br /> A. OWNER may perform other work related to 7 . 02 Coordination <br /> the Project at the Site by OWNER ' s employees , or let <br /> other direct contracts therefor, or have other work A. If OWNER intends to contract with others for <br /> performed by utility owners. If such other work is not the performance of other work on the Project <br /> at the <br /> noted in the Contract Documents , then : Site, the following will be set forth in Supplementary <br /> Conditions : <br /> 1 . written notice thereof will be given to <br /> CONTRACTOR prior to starting any such other 1 , the individual or entity who will have <br /> work ; and authority and responsibility for coordination of <br /> the activities among the various contractors will <br /> 2 . if OWNER and CONTRACTOR are be identified ; <br /> unable to agree on entitlement to or on the <br /> amount or extent, if any , of any adjustment in 2 , the specific matters to be covered by <br /> the Contract Price or Contract Times that such authority and responsibility will be <br /> should be allowed as a result of such other itemized ; and <br /> work , a Claim may be made therefor as <br /> provided in paragraph 10 . 05 . 3 , the extent of such authority and <br /> responsibilities will be provided . <br /> B . CONTRACTOR shall afford each other <br /> contractor who is a party to such a direct contract and B . Unless otherwise provided in the <br /> each utility owner ( and OWNER , if OWNER is per,,, Supplementary Conditions , OWNER shall have <br />sole <br /> forming the other work with OWNER's employees) authority and responsibility for such coordination , <br /> proper and safe access to the Site and a reasonable <br /> opportunity for the introduction and storage of <br /> materials and equipment and the execution of such ARTICLE 8 - OWNER ' S RESPONSIBILITIES <br /> other work and shall properly coordinate the Work with <br /> theirs . Unless otherwise provided in the Contract <br /> Documents , CONTRACTOR shall do all cutting , 8 . 01 Communications to Contractor <br /> fitting , and patching of the Work that may be required <br /> to properly connect or otherwise make its several A. Except as otherwise provided in these <br /> parts come together and properly integrate with such General Conditions , OWNER shall issue all communi- <br /> other work. CONTRACTOR shall not endanger any cations to CONTRACTOR through ENGINEER . <br /> work of others by cutting , excavating , or otherwise <br /> altering their work and will only cut or alter their work 8 . 02 Replacement of ENGINEER <br /> with the written consent of ENGINEER and the others <br /> whose work will be affected . The duties and A. In case of termination of the employment of <br /> responsibilities of CONTRACTOR under this ENGINEER , OWNER shall appoint an engineer to <br /> paragraph are for the benefit of such utility owners and whom CONTRACTOR makes no reasonable <br /> other contractors to the extent that there are <br /> 00700 - General Conditions REV 5- 10-13.doc <br /> 00700 - 27 <br /> F' \Public Works\ENGINEERING DIVISION PROJECTS\ 1 341 -Historic Dodgertown (fka VB Sports Village) Room Renovations )\Admin\bid documents\Master Contract Docs\Master <br /> Contract <br /> Documents\00700 - General Conditions REV 5- 10- 13. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.