Change Order or when a Claim for an adjustment in advice of ENGINEER , which bids , if any , will
<br /> be
<br /> Contract Price is determined on the basis of Cost of acceptable . If any subcontract provides that the
<br /> the Work , the costs to be reimbursed to Subcontractor is to be paid on the basis of Cost
<br /> CONTRACTOR will be only those additional or of the Work plus a fee , the Subcontractor' s
<br /> incremental costs required because of the change in Cost of the Work and fee shall be determined
<br /> the Work or because of the event giving rise to the in the same manner as CONTRACTOR ' s Cost
<br /> Claim . Except as otherwise may be agreed to in of the Work and fee as provided in
<br /> this para-
<br /> writing by OWNER , such costs shall be in amounts no graph 11 . 01 .
<br /> higher than those prevailing in the locality of the
<br /> Project, shall include only the following items , and 4 . Costs of special consultants
<br /> shall not include any of the costs itemized in para- ( including but not limited to
<br /> engineers ,
<br /> graph 11 . 01 . 6 . architects , testing laboratories , surveyors ,
<br /> attorneys , and accountants) employed for
<br /> a DeVrgll spsts fgr emplg„ees in the services specifically related to the Work,
<br /> mr-r-r nGeG.f the \ Alert YRder SIGhed „ les of i „ " 5 . Supplemental costs including the
<br /> GlassifiGations agreed UPOR by OWNER and following :
<br /> w+t"„�:�limitation superiatendeats , fereMeR, a . The proportion of necessary trans-
<br /> end ether persgnnel emplg, red full time at the portation , travel , and subsistence expenses of
<br /> Situze Pa;;YFGII GGStS for employees not employed CONTRACTOR' s employees incurred in dis-
<br /> charge of duties connected with the Work .
<br /> L�
<br /> t� VC7siv of their time_spent on the WArk
<br /> Payroll Gests shall indlude , but F; Gt be limited , b . Cost, including transportation and
<br /> saI.;;ir-i'rec5op�rtd wagesplus the ^gst of fringe maintenance , of all materials , supplies , equip-
<br /> ment, machinery, appliances , office , and
<br /> Icer titers , !Gymentl excise , and temporary facilities at the Site , and hand tools
<br /> payroll taxes , wc)FkeF6' GOMpeRsatiOR , health not owned by the workers, which are consumed
<br /> and retirereaeaefi#s ; ases, qi '�,� '�� in the performance of the Work , and cost, less
<br /> market value , of such items used but not con-
<br /> The expenses of perfgrming VVGrk outside gf sumed which remain the property of CON -
<br /> Fegular wGFk* ng heuFs , on Saturday, Sunday, GF
<br /> legal shall be iRGIYded an the ab . . . tv
<br /> the extent author 0zed by OWNER . c. Rentals of all construction equip-
<br /> ment and machinery , and the parts thereof
<br /> 2 . Cost of all materials and equipment whether rented from CONTRACTOR or others
<br /> furnished and incorporated in the Work , includ - in accordance with rental agreements approved
<br /> ing costs of transportation and storage thereof, by OWNER with the advice of ENGINEER , and
<br /> and Suppliers' field services required in the costs of transportation , loading , unloading ,
<br /> connection therewith . All cash discounts shall assembly , dismantling , and removal thereof.
<br /> accrue to CONTRACTOR unless OWNER All such costs shall be in accordance with the
<br /> deposits funds with CONTRACTOR with which terms of said rental agreements . The rental of
<br /> to make payments , in which case the cash any such equipment, machinery , or parts shall
<br /> discounts shall accrue to OWNER . All trade cease when the use thereof is no longer
<br /> discounts , rebates and refunds and returns necessary for the Work .
<br /> from sale of surplus materials and equipment
<br /> shall accrue to OWNER , and CONTRACTOR d . Sales , consumer, use , and other
<br /> shall make provisions so that they may be similar taxes related to the Work , and for which
<br /> obtained . CONTRACTOR is liable , imposed by Laws and
<br /> Regulations .
<br /> 3 . Payments made by CONTRACTOR
<br /> to Subcontractors for Work performed by e . Deposits lost for causes other than
<br /> Subcontractors . If required by OWNER , CON - negligence of CONTRACTOR , any Sub-
<br /> TRACTOR shall obtain competitive bids from contractor, or anyone directly or indirectly
<br /> subcontractors acceptable to OWNER and employed by any of them or for whose acts any
<br /> CONTRACTOR and shall deliver such bids to of them may be liable, and royalty payments
<br /> OWNER , who will then determine , with the and fees for permits and licenses .
<br /> 00700 - General Conditions REV 5- 10- 13 doc
<br /> 00700 - 32
<br /> F. \Public Works\ENGINEERING DIVISION PROJECTS\ 1341 -Historic Dodgertown ( fka VB Sports Village) Room Renovations )VAdmin\bid documents\Master Contract Docs\Master
<br /> Contract
<br /> Documents\00700 - General Conditions REV 5- 10-13 doc
<br />
|