Laserfiche WebLink
SECTION 01050 <br /> PROJECT LAYOUT <br /> 1 . 1 GENERAL <br /> A . Contractor shall develop and make all detail surveys and measurements needed <br /> for construction . <br /> B . Be solely responsible for all locations , dimensions and levels . No data other than <br /> written orders of the ENGINEER shall justify departure from the dimensions and <br /> levels required by the Drawings . <br /> C . Safeguard all points , measurements , marks and monuments made or established <br /> on the Work , and reestablish same , if disturbed . Rectify all work improperly <br /> installed because of not maintaining or not protecting said points , measurements , <br /> marks and monuments . <br /> D . When requested by the ENGINEER , provide such facilities and assistance as may <br /> be necessary for the ENGINEER to check work performed by the CONTRACTOR . <br /> E . The cost of performing engineering and layout work described above shall be <br /> included in the contract unit prices for the various items of work to which it is <br /> incidental . <br /> F . . Prior to commencing work , the CONTRACTOR shall satisfy himself as to the <br /> accuracy of all survey and existing site information as indicated in the Contract <br /> Documents . Immediately notify the ENGINEER upon discovery of any errors , <br /> inaccuracies or omissions . The commencing of any of the work by the <br /> CONTRACTOR shall be held as the CONTRACTOR ' s acceptance that existing <br /> site information is correct and accurate , without any reasonably inferable errors , <br /> inaccuracies or omissions . <br /> + + END OF SECTION + + <br /> 1050- 1 01050 Field Engineering <br /> F :\Public Works\ENGINEER ING DIVISION PROJECTS\1341 -Historic Dodgertown ( fka VB Sports Village) Room Renovations)V\dmin\bid documents\Master Contract <br /> Docs\Master Contract Documents\01050 - Field Engineering.doc <br />