Laserfiche WebLink
SECTION 01215 <br /> GENERAL QUALITY CONTROL <br /> 1 . 1 DESCRIPTION OF REQUIREMENTS <br /> A . Definitions : Specific quality control requirements for the work are indicated <br /> throughout the Contract Documents . The requirements of this section are <br /> primarily related to the performance of the work beyond the furnishing of <br /> manufactured products . The term " Quality Control " includes , but is not <br /> necessarily limited to , inspection and testing and associated requirements . <br /> This section does not specify or modify the OWNER and ENGINEER duties <br /> relating to quality review and Contract surveillance . <br /> 1 . 2 RESPONSIBILITY FOR INSPECTIONS AND TESTS <br /> CONTRACTOR Responsibility : <br /> A . The CONTRACTOR will employ and pay for the services of independent <br /> testing laboratories to perform those required inspections and tests . <br /> B . No failure of test agencies , whether engaged by the OWNER or <br /> CONTRACTOR , to perform adequate inspections of tests or to properly <br /> analyze or report results , shall relieve the CONTRACTOR of responsibility for <br /> the fulfillment of the requirements of the Contract Documents . It is recognized <br /> that the required inspection and testing program is intended to assist the <br /> CONTRACTOR , OWNER , ENGINEER , and governing authorities in the <br /> nominal determination of probable compliance with requirements for certain <br /> crucial elements of work . The program is not intended to limit the <br /> CONTRACTOR in his regular quality control program , as needed for general <br /> assurance of compliance . <br /> 1 . 3 QUALITY ASSURANCE <br /> A . General Workmanship Standards : It is a requirement that each category of <br /> tradesman or installer performing the work be pre-qualified , to the extent of being <br /> familiar with the applicable and recognized quality standards for his category of <br /> work , and being capable of workmanship complying with those standards . <br /> 1 . 4 PRODUCT DELIVERY- STORAGE- HANDLING <br /> Handle , store and protect materials and products , including fabricated components , by <br /> methods and means which will prevent damage , deterioration and losses ( and resulting <br /> delays ) , thereby ensuring highest quality results as the performance of the work <br /> progresses . Control delivery schedules so as to minimize unnecessary long -term <br /> storage at the project site prior to installation . <br /> + + END OF SECTION + + <br /> 01215- 1 01215 General Quality Control <br /> F : \PublicWorks\ENGINEERING DIVISION PROJECTS\1 341 - Historic Dodgertown (fka VB Sports Village ) Room <br /> Renovation s )\Admin \bid documents\Master Contract Docs\Master Contract Documents\01215 General Quality. doc <br />