Laserfiche WebLink
a ) Supply and install wire for 2 duplex outlets and 1 quad outlet at <br /> counter area . <br /> b ) Remove and replace existing outlets and switches in room . White <br /> decor switches and receptacles . <br /> c ) Remove and replace all TV, computer and telephone jacks . <br /> d ) Reinstall bathroom fixtures and closet lights . <br /> MISCELLANEOUS <br /> a ) Supply and install bi -fold doors for existing closets , opening 68x <br /> 6 o . <br /> b ) Supply and install 2- 1/2 " round Ives satin nickel bi - pass pulls for <br /> bi -fold doors . <br /> C ) Supply and install Deltana 34/2 " x 3 - 1/2 " square steel US15 satin <br /> nickel door hinges and door strikes . <br /> d ) Supply and install new wire closet shelving . <br /> e ) Remove and replace bathroom door. Hollow core hardboard <br /> primed 1 - 3/8 " doors, doors to have four solid wood edges . <br /> f) Remove and replace all base and casing throughout unit and <br /> replace with new. <br /> g) New full length mirror, 20" x 60" frameless with clips . <br /> h ) Supply new upper and lower cabinet at proposed bar area . <br /> Cabinets to be constructed of plywood with solid wood face <br /> frames, full overlay door, raised panel . Owner to determine <br /> wood species . Allow for birch , cherry, mahogany . Drawers to <br /> have undermount "soft close " drawer guides . Countertop to be <br /> granite . 2 " computer grommet to pass through counter. <br /> i ) All pictures, art work, and mirrors to be hung back on walls . <br /> j ) All fixtures and hardware should be brushed nickel . <br /> FLOORING <br /> a ) Supply and install bathroom flooring 18" x 18 " rectified porcelain <br /> tile, minimum tile grout lines, grout and tile to be sealed . Dal -Tile <br /> Palatina PT 95 . <br /> b ) Supply and install 4" base board porcelain tile . <br /> c ) Continue the bathroom floor tile out to extend to the end of the <br /> bar, and to align with end of bathroom wall . <br /> d ) Tile to be installed on a diagonal . <br /> e ) Room carpet to be removed and re - installed with new anti - microbial <br /> pads and nail strips . <br /> PAINTING & DRYWALL FINISH <br /> a ) Apply Gardz on all wall surfaces, skim walls to level 4 finish and <br /> 01310-6 01310 Detailed Construction Scope of Work <br /> F \Public Works\ENGINEERING DIVISION PROJECTS\1 341 -Historic Dodgertown (fka VB Sports Village) Room <br /> Renovations )\Hdmin\bid documents\Master Contract Docs\Master Contract Documents\01310 - Detailed Construction Scope of <br /> Work . doc <br />