My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-211A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-211A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2015 2:00:04 PM
Creation date
10/1/2015 5:47:02 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/22/2013
Control Number
2013-211A
Agenda Item Number
8.M.
Entity Name
OAC Action Construction
Subject
Contract Documents and Specifications
Historic Dodgertown Room Renovations
Project Number
1341
Bid Number
2014003
Alternate Name
Vero Beach Sports Village
Supplemental fields
SmeadsoftID
12688
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUESTION NO . 13 <br /> Do we need to just paint the walls without wall paper or do we add knock down texture ? <br /> ANSWER NO . 13 <br /> Knockdown texture will be installed on all walls, whether the rooms have wallpaper or not . <br /> QUESTION NO . 14 <br /> Referencing Section 01310 - Detailed Construction Scope of Work : <br /> Cabanas — Plumbing <br /> i ) Contractor to install ( POU ) Point of Use electric water heater. Merloni Ariston 7 <br /> gallon, Model # GL6 ( Provided by Owner ) <br /> During Pre - bid Conference it was stated that Contractor would be responsible for furnishing and installing <br /> water heater. Please clarify who will be responsible for furnishing the water heaters . <br /> ANSWER NO. 14 <br /> Contractor is responsible to furnish and install hot water heaters . <br /> QUESTION NO . 15 <br /> Referencing Section 01310 - Detailed Construction Scope of Work : <br /> General : Regular Rooms, Small Rooms, Suites and Cabanas . <br /> Remove any drywall due to moisture damage . <br /> During Pre- bid Conference it was brought to the Owners attention that moisture damage would be <br /> difficult to determine prior to work being performed . The Owner stated that any unforeseen damage <br /> would be treated as a Change Order to the original bid . Please confirm that moisture damage and <br /> possible mold will be treated as an addition to the original bid amount. We would like to suggest an <br /> alternative answer to this matter. We ask that the Owner would consider providing an additional line <br /> item on the " Itemized Bid Schedule" for a quantity of wallboard to be replaced in those units where the <br /> damage is evident . <br /> ANSWER NO . 15 <br /> There may be intermittent mold in bathrooms or under wallpaper or by outside walls — remove <br /> by <br /> standard acceptable mold remediation technique or replacement of drywall . Cost for some mold <br /> remediation work and /or drywall replacement should be included in the bid for all rooms . No additional <br /> compensation will be allowed for mold remediation , even if it is not known and encountered during <br /> construction . <br /> QUESTION NO . 16 <br /> Referencing Section 00800 — Supplementary Conditions to the General Conditions . <br /> Page 7 of 11 <br /> F:IPub&c WorksIENGINEERINGDMSIONPROJECTSII341-Ku oric Dodgertown (Aa VB Sports 119age) Room Renovadons) IAdminlbid <br /> docum entsl ADDEND UM NO 109-17-2013.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.