Laserfiche WebLink
8 <br /> QUESTION <br /> Will materials be able to be left in storage pods during the Blackout period ? <br /> ANSWER <br /> Yes — in the area designated by the warehouse area near Field No . 4 as shown on attached Plan <br /> Sheet 2A . <br /> QUESTION <br /> Does knockdown go in every room ? <br /> ANSWER <br /> New knockdown on all rooms — except bathrooms which will have finished walls . Please check <br /> every room for water damage, including baseboards and ceilings . <br /> QUESTION <br /> If water damage is not evident until actual construction begins, how will that be treated when <br /> under construction ? <br /> ANSWER <br /> If it' s something that' s considered outside the scope of work, it will be addressed during <br /> construction and it will have to be an extra to the contract, which must be approved by the Board <br /> of County Commissioners through a change order. <br /> All bids should reflect possible mold and mildew remediation, including removal of affected <br /> drywall . <br /> QUESTION <br /> Has the Building Department made aware that this project is upcoming and been supplied with <br /> drawings ? Can you find out if they will require signed and sealed drawings ? <br /> ANSWER <br /> The Building Division is aware of the project . Copies of the Detailed Construction Scope of Work in <br /> the Bid Docs (Section 01310 ), along with the plans provided should be adequate . Signed and <br /> sealed drawings are not required . <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\ 1341 -Historic Dodgertown ( fka VB Sports Village) Room <br /> Renovations)\Admin\Meetings\Pre-Bid Meeting Minutes and Questions 09-25-2013 .doc <br />