Laserfiche WebLink
14 <br /> QUESTION <br /> Do the curtains stay? <br /> ANSWER <br /> They will be re- used . They will need to be removed during construction . <br /> QUESTION <br /> Does wiring need to be changed to hidden ? <br /> ANSWER <br /> No . That is not in the DETAILED CONSTRUCTION SCOPE OF WORK SECTION 01310 . <br /> QUESTION <br /> Is there a plumbing fixture list ? <br /> ANSWER <br /> This is included in the DETAILED CONSTRUCTION SCOPE OF WORK SECTION 01310 " Plumbing" in <br /> Bid Docs for each room style . <br /> QUESTION <br /> Are the specs for the "tankless" hot water heater included in the bid docs ? <br /> ANSWER <br /> Yes, they are in the DETAILED CONSTRUCTION SCOPE OF WORK SECTION 01310, Cabanas <br /> " Plumbing" section of the Bid Docs . <br /> QUESTION <br /> Will the amps/ power be an issue for the new "tankless" hotwater heater ? <br /> ANSWER <br /> The cabanas have sufficient power — the box is outside the cabana . Service connection to the box <br /> should be included in bid . <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\ 1341 -Historic Dodgertown ( fka VB Sports Village) Room <br /> Renovations)Wdmin\Meetings\Pre-Bid Meeting Minutes and Questions 09-25 -2013 . doc <br />