My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-211A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-211A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2015 2:00:04 PM
Creation date
10/1/2015 5:47:02 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/22/2013
Control Number
2013-211A
Agenda Item Number
8.M.
Entity Name
OAC Action Construction
Subject
Contract Documents and Specifications
Historic Dodgertown Room Renovations
Project Number
1341
Bid Number
2014003
Alternate Name
Vero Beach Sports Village
Supplemental fields
SmeadsoftID
12688
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,t SECTION 01310 <br /> DETAILED CONSTRUCTION SCOPE OF WORK <br /> REVISED OCTOBER 4, 2013 <br /> 1 . 1 GENERAL REQUIREMENTS <br /> A . There are 66 rooms to be renovated . ( 45 regular rooms — queens, 2 cabanas, 9 <br /> suites and 10 small rooms — doubles ) <br /> Be Rooms are to be renovated at minimum 5 rooms at a time . Each group of rooms <br /> shall be completed within 16 calendar days for substantial completion and 19 days <br /> for final completion . See tentative schedule which outlines the preliminary dates <br /> for room renovations . (Section 00520, Article 4 . 02 ) <br /> Co A Notice to Proceed will be issued for each group . On Day Sixteen ( 16 ) of the <br /> nineteen ( 19 ) calendar days, a walk-through will be conducted and a Certificate of <br /> Substantial Completion , along with a list of items to be completed or corrected will <br /> be issued . Said work to be completed within three ( 3 ) calendar days . <br /> D . At least 3 weeks prior to ordering materials or scheduling work on each group of <br /> rooms, Contractor must coordinate with Indian River County and Verotown , LLC <br /> ( contact person Craig Callan ( 772 ) 257-8555 ) and obtain a firm schedule for the <br /> renovations . <br /> E . A full time Field Superintendent is required on site at all times that work is being <br /> performed . <br /> F . Contractor is responsible for removing debris from site to dumpster on a daily <br /> basis . Dumpster location to be coordinated with Indian River County and Verotown , <br /> LLC . <br /> G . Contractor is responsible to provide all necessary equipment, temporary lighting <br /> and procuring all materials to complete the work as specified in the contract <br /> documents . <br /> H . Contractor is responsible to obtain and pay all required permits . <br /> I . Delivery and storage of all products and materials must be coordinated with Indian <br /> River County and Verotown , LLC . Contractor is responsible to provide storage for <br /> items to be removed , stored and re- installed in the rooms . <br /> J . The specific improvements required for each room type is as follows . <br /> 013104 01310 Detailed Construction Scope of Work <br /> F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1341 -Historic Dodgertown (fka VI3 Sports Village) Room <br /> Renovations)\Admin\bid documents\Master Contract Docs\Master Contract Documents\01310 - Detailed Construction Scope of Work <br /> REVISED 404-2013.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.